Filter Search


Asia-Pacific


A PHP Error was encountered

Severity: Notice

Message: Undefined index: No

Filename: region/regionviewtenders.php

Line Number: 61

Backtrace:

File: /home/tigulfinfo/html/application/views/region/regionviewtenders.php
Line: 61
Function: _error_handler

File: /home/tigulfinfo/html/application/controllers/Regiontenders.php
Line: 66
Function: view

File: /home/tigulfinfo/html/index.php
Line: 315
Function: require_once

Location Summary Deadline
-Key-Switch-Simulation-In-Sb-1-As-Per-Clw's-Spec.-No.--Clw/es/3/0079-(alt.-a).-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Key-Switch-Simulation-In-Sb-1-As-Per-Clw's-Spec.-No.--Clw/es/3/0079-(alt.-a).-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Key Switch Simulation In Sb-1 As Per Clw's Spec. No.- Clw/es/3/0079 (alt.-a).
Key Switch Simulation In Sb-1 As Per Clw's Spec. No.- Clw/es/3/0079 (alt.-a). [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Key-Switch-Simulation-In-Sb-1-As-Per-Clw's-Spec.-No.--Clw/es/3/0079-(alt.-a).-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-12-24
procedure packages and surgical coverage for the companies in helse midt-norway - prior information notice. 2024-12-24
Thailand Contract Work For The Position Of Assistant Safety Officer For The Area Of ????som. For The Year 2025 2024-12-24
-Pin-Assembly-Adjusting-Locking-Slack-Adjuster-To-Emd-Part-No.9526180-Drg-No.-9526180-Alt--Bdlb-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Tot>India -Pin-Assembly-Adjusting-Locking-Slack-Adjuster-To-Emd-Part-No.9526180-Drg-No.-9526180-Alt--Bdlb-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Tot>Supply Of Pin Assembly
Pin Assembly Adjusting Locking Slack Adjuster To Emd Part No.9526180 Drg No. 9526180 Alt- Bdlb Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Tot
-Pin-Assembly-Adjusting-Locking-Slack-Adjuster-To-Emd-Part-No.9526180-Drg-No.-9526180-Alt--Bdlb-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Tot>2024-12-24
China Airbus Tianjin Second A320 Family Aircraft Final Assembly Line Project Logistic Storage Shelves 2024-12-24
Thailand Contracting For Construction To Expand/demolish The Electrical System C-67-a-marsr.0200.01.1 mr. Yuthana Khamtan, Village No. 10, San Pong Subdistrict, Mae Rim District, Chiang Mai Province 2024-12-24
Thailand Contract Work As An Assistant Safety Officer In The Pilot Plant Operation Area For The Year 2025 2024-12-24
Thailand Contracting For Construction To Expand/demolish The Electrical System C-67-a-marsr.0202.01.1 ms. Suding Moosor, Village No. 7, Rim Tai Subdistrict, Mae Rim District, Chiang Mai Province 2024-12-24
-1-1/4-Inches-Angle-Cock-(bp)-Green-Colour-With-Vent-As-Per-Clw-Drg.-No.-0/2/65/386-Alt-6-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>India -1-1/4-Inches-Angle-Cock-(bp)-Green-Colour-With-Vent-As-Per-Clw-Drg.-No.-0/2/65/386-Alt-6-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>Supply Of 1-1/4 Inches Angle Cock
1-1/4 Inches Angle Cock (bp) Green Colour With Vent As Per Clw Drg. No. 0/2/65/386 Alt-6 Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal
-1-1/4-Inches-Angle-Cock-(bp)-Green-Colour-With-Vent-As-Per-Clw-Drg.-No.-0/2/65/386-Alt-6-Or-Latest-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>2024-12-24
India Supply Of Rubberised Cork Sheet Gasket Consisting Of 20 Items, 66 Nos., As Per Cb/lko Drawing No. 4cb/el/gk-1047/13 Sheet No. 1 To 5, Item S.no. 1 To 18, 21 & 24 Of Sheet No. 1 Of 5. List Of 20 Items Attached As Annexure-a. Material Procurement Should Be 2024-12-24
Whats app