Filter Search


Asia-Pacific


A PHP Error was encountered

Severity: Notice

Message: Undefined index: Be

Filename: region/regionviewtenders.php

Line Number: 61

Backtrace:

File: /home/tigulfinfo/html/application/views/region/regionviewtenders.php
Line: 61
Function: _error_handler

File: /home/tigulfinfo/html/application/controllers/Regiontenders.php
Line: 66
Function: view

File: /home/tigulfinfo/html/index.php
Line: 315
Function: require_once

Location Summary Deadline
endoscope washers, storage/drying cabinets and pre-washing furniture 2024-12-04
-Plate-Size:thick-63mm-X-1250mm-X-5000mm-Spec.no:is:2062:2011-Gr-e-410quality-c-Killed-Normalised-Heat-Treated-Condition-/-Normalized-Rolling-Ut-Quality-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quant>India -Plate-Size:thick-63mm-X-1250mm-X-5000mm-Spec.no:is:2062:2011-Gr-e-410quality-c-Killed-Normalised-Heat-Treated-Condition-/-Normalized-Rolling-Ut-Quality-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quant>Supply Of Plate Size:63x1250x5000
Plate Size:thick 63mm X 1250mm X 5000mm Spec.no:is:2062:2011 Gr-e-410quality-c Killed Normalised Heat Treated Condition / Normalized Rolling Ut Quality [ Warranty Period: 30 Months After The Date Of Delivery ][quant
-Plate-Size:thick-63mm-X-1250mm-X-5000mm-Spec.no:is:2062:2011-Gr-e-410quality-c-Killed-Normalised-Heat-Treated-Condition-/-Normalized-Rolling-Ut-Quality-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quant>2024-12-04
-Consultancy-Services-Of-Authoritys-Engineer-For-Supervision-Of-The-Work-Of-Constn-Of-Shilpa-Setu-Over-River-Damodar-Parallel-To-The-Existing-Krishak-Setu-Of-Ba-Road-And-Constn-Of-Bridge-Over-Eden-Canal-Of-Ba-Road-In-The>India -Consultancy-Services-Of-Authoritys-Engineer-For-Supervision-Of-The-Work-Of-Constn-Of-Shilpa-Setu-Over-River-Damodar-Parallel-To-The-Existing-Krishak-Setu-Of-Ba-Road-And-Constn-Of-Bridge-Over-Eden-Canal-Of-Ba-Road-In-The>Wbpwd/se/wc-i/rfp-03/24-25/1
Consultancy Services Of Authoritys Engineer For Supervision Of The Work Of Constn Of Shilpa Setu Over River Damodar Parallel To The Existing Krishak Setu Of Ba Road And Constn Of Bridge Over Eden Canal Of Ba Road In The
-Consultancy-Services-Of-Authoritys-Engineer-For-Supervision-Of-The-Work-Of-Constn-Of-Shilpa-Setu-Over-River-Damodar-Parallel-To-The-Existing-Krishak-Setu-Of-Ba-Road-And-Constn-Of-Bridge-Over-Eden-Canal-Of-Ba-Road-In-The>2024-12-04
Thailand Purchase A Wall-mounted Ventilation Fan For Use In The Lan Room. 2024-12-04
-Coolant-(208-Ltr)-Part-No:0165-90-7992-For-New-Brm,-New-Duo,pctm,-New-Bcmmachines.-Make-deutz.-Hsn:-34039900-Amc:-168-Note-kindly-Consider-Unit:01-No=01-Barrel-(208-Ltrs)>India -Coolant-(208-Ltr)-Part-No:0165-90-7992-For-New-Brm,-New-Duo,pctm,-New-Bcmmachines.-Make-deutz.-Hsn:-34039900-Amc:-168-Note-kindly-Consider-Unit:01-No=01-Barrel-(208-Ltrs)>Supply Of Coolant (208 Ltr) Part No:0165-90-7992
Coolant (208 Ltr) Part No:0165-90-7992 For New Brm, New Duo,pctm, New Bcmmachines. Make-deutz. Hsn: 34039900 Amc: 168 Note-kindly Consider Unit:01 No=01 Barrel (208 Ltrs)
-Coolant-(208-Ltr)-Part-No:0165-90-7992-For-New-Brm,-New-Duo,pctm,-New-Bcmmachines.-Make-deutz.-Hsn:-34039900-Amc:-168-Note-kindly-Consider-Unit:01-No=01-Barrel-(208-Ltrs)>2024-12-04
Japan Construction Of Wiring And Measurement System Outside Of Vacuum Vessel For Welded-type Strain Gauge, 1 Set 2024-12-04
India Request For Empanelment (rfe) For Transaction/financial, Technical, Legal, Tax & Accounting Consultants 2024-12-04
-Nylon-Cable-Tie-Type-1-For-Electric-Locomotive-As-Per-Clw-Specn.-No.-Clw.es.c.38-Alt-e.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Nylon-Cable-Tie-Type-1-For-Electric-Locomotive-As-Per-Clw-Specn.-No.-Clw.es.c.38-Alt-e.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Nylon Cable Tie Type-1 For Electric Loco
Nylon Cable Tie Type-1 For Electric Locomotive As Per Clw Specn. No. Clw.es.c.38 Alt-e. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Nylon-Cable-Tie-Type-1-For-Electric-Locomotive-As-Per-Clw-Specn.-No.-Clw.es.c.38-Alt-e.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-12-04
Japan Construction Work Of The Superstructure Of Nyudani Bridge In Ono Aburasaka Road 2024-12-04
Thailand Supply And Construction Of Transmission Lines 500 Kv Burapa Power Generation Power Plant – Phanom Sarakham, Sectionalizing Of 500 Kv Pluak Daeng – Wang Noi To Phanom Sarakham Substation, And Lowering Of 230 Kv Bang Pakong – Prachin Buri 2) 2024-12-04
Whats app