Filter Search


Asia-Pacific


Location Summary Deadline
India Erection Of 3rd Ptr Bay (132/33kv, 80mva Ptr Bay Excluding Ptr Erection Work) At 132/33kv Ss Domakonda In Omc Circle, Nizamabad In Karimnagar Zone 2026-01-05
India On Risk & Cost Piped Water Supply Scheme Forvillage- Kundi (khaspara) ,kundi(purvtola) Block-wadrafnagar District – Balrampur(c.g.)construction, Testing And Commissioning Of R.c.c. Elevated Service Reservoir Of 00 Kl Capacities – 00 No. & Staging 12 Mtr{s 2026-01-05
India Digital Wheel Diameter Gauge .#* Digital Wheel Diameter Gauge With Tablet For Train Set 18 And Demu, Make- Pie Or Similar. Sp ecification Attached. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-05
India Providing And Laying I/l Tiles In St Banti To Parmjit W-7 2026-01-05
India Tender Invited For Boxing Gloves (v2) (q3)##quantity: 8## 2026-01-05
India Construct Pcc Road From Uttam Mal House To Jharna Malik House 25 Feet Long 6 Feet Widebooth 73 2026-01-05
-Community-Toilet-Construction-Beside-Nityanandapur-Footbal-Field-Jl-172dag-419-Under-Habibpur-Gp>India -Community-Toilet-Construction-Beside-Nityanandapur-Footbal-Field-Jl-172dag-419-Under-Habibpur-Gp>13/e-hdb/2025-26 Date-01/12/2025 Sl No-60
Community Toilet Construction Beside Nityanandapur Footbal Field Jl-172dag-419 Under Habibpur Gp
-Community-Toilet-Construction-Beside-Nityanandapur-Footbal-Field-Jl-172dag-419-Under-Habibpur-Gp>2026-01-05
-Repair-/-Maintenance-Of-The-Rural-Roads/cds-For-Five-Years,-Constructed-Under-Pradhan-Mantri-Gram-Sadak-Yojna-And-Other-Scheme--Post-5-Year>India -Repair-/-Maintenance-Of-The-Rural-Roads/cds-For-Five-Years,-Constructed-Under-Pradhan-Mantri-Gram-Sadak-Yojna-And-Other-Scheme--Post-5-Year>Mp11mtn231/dhar-1
Repair / Maintenance Of The Rural Roads/cds For Five Years, Constructed Under Pradhan Mantri Gram Sadak Yojna And Other Scheme- Post 5 Year
-Repair-/-Maintenance-Of-The-Rural-Roads/cds-For-Five-Years,-Constructed-Under-Pradhan-Mantri-Gram-Sadak-Yojna-And-Other-Scheme--Post-5-Year>2026-01-05
India Intracoronary Shunt Made Of Clear Plastic With Or Without Wire Reinforecement And Having A string To Facilitate Easy Removal After Anastomosis Size: 1.0mm Medtronic .#* Srphc206061-intracoronary Shunt Made Of Clear Plastic With Or Without Wire Reinforecem 2026-01-05
India Renovation Upgradation And New Cons. Work At Govt. Madhav Arts And Commerce College, Dist. Ujjain M.p. Nit-73 2026-01-05
Whats app