Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Paradeep-badabandha 3rd & 4th Line (18.51 Km) Including Electrification Works And Shifting Of Utilities, Signalling Cables & Equipments But Excluding Signalling Works On Engineering, Procurement & Construction (epc) Mode. 2024-11-29
Korea Republic of Changnyong Small River Disaster Recovery Project 2024-11-29
Thailand Real Estate Management Service Contract 2024-11-29
Japan A: Electricity Used In The Wakayama National College Of Technology Campus Area: Contracted Power 315kw, Planned Annual Power Consumption 922,096kwh, B: Electricity Used In The Wakayama National College Of Technology Dormitory Area: Contracted Power 250kw, 2024-11-29
Japan Pfi Based Design, Construction And Maintenance Of "j4 Bldg." 2024-11-29
Japan Transmitting Adaptive Optics System: Procurement Of Optical Devices For Adaptive Optics Systems For Satellite Constellations, Complete Set 2024-11-29
India Sale Of Scrap At East Central Railway. 2024-11-29
Japan Purchase Of Fixtures And Equipment For The Establishment Of The Okuma Analytical And Research Center Satellite Office 2024-11-29
Japan "joyo" Heat Sink Material Connection Duct Etc. Production Set 2024-11-29
-Overhauling-Kit-For-Drain-Valve-(kbil-Part-No.i82281)-Of-Electric-Ccb-For-3-Phase-Locomotives.-[-Warranty-Period:-30-Months-After-The>India -Overhauling-Kit-For-Drain-Valve-(kbil-Part-No.i82281)-Of-Electric-Ccb-For-3-Phase-Locomotives.-[-Warranty-Period:-30-Months-After-The>Supply Of 29161976 - Overhauling Kit For Drain Valve (kbil Part No.i82281) Of Electric Ccb For 3 Phase Locomotives
Overhauling Kit For Drain Valve (kbil Part No.i82281) Of Electric Ccb For 3 Phase Locomotives. [ Warranty Period: 30 Months After The
-Overhauling-Kit-For-Drain-Valve-(kbil-Part-No.i82281)-Of-Electric-Ccb-For-3-Phase-Locomotives.-[-Warranty-Period:-30-Months-After-The>2024-11-29
Whats app