Filter Search


Asia-Pacific


Location Summary Deadline
India Cab Side Window .#* Cab Side Window Cat No.r/9/0017 As Per Drg.no. Drg.no.29172020 Alt-nil As Per Specn. Clw spec No.clw/ms/3/014 Alt-5 [ Warranty Period: 180 Months After The Date Of Delivery ] ] 2025-08-25
-Widening-Of-Valley-Side-At-Km-20.900,-Km-35.500-And-Km-36.700-And-Culvert-At-13-Locations-Viz.-Km-17.600,-Km-17.800,-Km-18.300,-Km-20.200,-Km-21.500,-Km-21.650,-Km-21.850,-Km-32.800,-Km-33.100,-Km-38.300,-Km-40.300,-Km>India -Widening-Of-Valley-Side-At-Km-20.900,-Km-35.500-And-Km-36.700-And-Culvert-At-13-Locations-Viz.-Km-17.600,-Km-17.800,-Km-18.300,-Km-20.200,-Km-21.500,-Km-21.650,-Km-21.850,-Km-32.800,-Km-33.100,-Km-38.300,-Km-40.300,-Km>Nhidcl/hq/wb/rang-sev/wvc/2025
Widening Of Valley Side At Km 20.900, Km 35.500 And Km 36.700 And Culvert At 13 Locations Viz. Km 17.600, Km 17.800, Km 18.300, Km 20.200, Km 21.500, Km 21.650, Km 21.850, Km 32.800, Km 33.100, Km 38.300, Km 40.300, Km
-Widening-Of-Valley-Side-At-Km-20.900,-Km-35.500-And-Km-36.700-And-Culvert-At-13-Locations-Viz.-Km-17.600,-Km-17.800,-Km-18.300,-Km-20.200,-Km-21.500,-Km-21.650,-Km-21.850,-Km-32.800,-Km-33.100,-Km-38.300,-Km-40.300,-Km>2025-08-25
Thailand Improve Replacement Equipment Change Udb01 Fie Fie Fie Fie (nong Na Kham Subdistrict, Mueang District, Udon Thani Province, I -67-d-d-ud268.hb.2208 2025-08-25
India Lateral Bump Stop For Fiat Bogies To Drg. No. C53973 Reb Bred 8374, rev.02r1 To Be Read With T.s 17.531.100.03 With Amndt-1, T.s 17.617.100.02, mdts 148 Rev. 01, Mdts 122 Rev.03. .#* Lateral Bump Stop For Fiat Bogies To Drg. No. C53973 Reb Bred 8374, Rev. 2025-08-25
Japan 4-inch Membrane Filtration System 2025-08-25
India Machine Room Blower .#* Machine Room Blower With Motor As Per Clws Spec. No. Clw/es/3/0020 (alt.-h) For W ag9 Type Electric Locos. [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total 2025-08-25
Japan Dispensing Automation System Set 2025-08-25
India Engineering, Procurement And Construction (epc) Document For Construction Of New Railway Line From Km 124/400 To 165/380 In between Bahari And Gondawali Stations Including Earthwork, Minor Bridges, Major Bridges, Important Bridges, Viaduct, Rob (rcc Box t 2025-08-25
Japan M6?????1??? 2025-08-25
-Consultancy-Services>India -Consultancy-Services>Consultancy Services For Preparation Of Dpr For Widening To Four Lane With Paved Shoulder From Two Lane With Paved Shoulder From Km.0.00 To Km.118.470 Kalaburagi Wadi Yadgiri Kadechur Section Of Nh 150 In The State Of Karnataka
Consultancy Services
-Consultancy-Services>2025-08-25
Whats app