Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Retaining Wall & Horizontal Platform At Upasana Canal Bank Biswarjan Ghat, New Town. 2025-11-01
India Solar Light 17-bramhan Para,lohar Para,duley Para,near Ram Mandir,simli Culvert,simli Pry School,mandal Para,pal Para, Dealer Para And 3(three) Others 2025-11-01
India Sinking Of Tubewell Near House Of Sampa Das At Jatadharypally 2025-11-01
India Construction Of Drain From House Of Haripada Ari To Land Of Manas Maity At Booth No 172 Plot No Jl No 28 Mouza Pankhai Under Baratala Gram Panchayat (scheme Id Apas/01/215/172/0008) 2025-11-01
India Repairing Of Road Infront Of Balai Mandals House,jl No-88,plot No-329 2025-11-01
India Construction Of Concrete Road From Subal Janas House To Monindra Janas Construction,jl No-211,plot No-1889-1888 2025-11-01
-Pastillation-Unit--pastillaton-Unit-(it-Shall-Consist-No-1.000-Of-Rotary-Depositor-Feeding-System;-Process-Conveyor-System;-Process-Water-Skid-Package;-Jacketed-Product-Filter-Assembly;-Control-System-Etc.)-Complete-Specifi>India -Pastillation-Unit--pastillaton-Unit-(it-Shall-Consist-No-1.000-Of-Rotary-Depositor-Feeding-System;-Process-Conveyor-System;-Process-Water-Skid-Package;-Jacketed-Product-Filter-Assembly;-Control-System-Etc.)-Complete-Specifi>Nfp/pur/sb/240050/2523587
Pastillation Unit -pastillaton Unit (it Shall Consist No 1.000 Of Rotary Depositor Feeding System; Process Conveyor System; Process Water Skid Package; Jacketed Product Filter Assembly; Control System Etc.) Complete Specifi
-Pastillation-Unit--pastillaton-Unit-(it-Shall-Consist-No-1.000-Of-Rotary-Depositor-Feeding-System;-Process-Conveyor-System;-Process-Water-Skid-Package;-Jacketed-Product-Filter-Assembly;-Control-System-Etc.)-Complete-Specifi>2025-11-01
India Construction Of Concrete Basement Of Laro Passenger Shed 2025-11-01
India Set Of Spares For Bio Tank Mounting .#* Set Of Spares For Bio Tank Mounting Arrangement: (1) Safety Strap As Per Drawing No.mi0057 12 Alt. B,item No-1 And (2) Safety Strap As Per Drawing No.mi005712 Alt.b, Item No-02 Make/brand: As Per drg. [ Warranty Per 2025-11-01
India Construction Of Cc Drain From Rabin Dhibar House Towards Khirod Das House, Plot No 2304 2025-11-01
Whats app