Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of R.c.c. Nala From Gate Hathanipara Muktidham To Kanhar Talab In Shyama Prasad Mukharji Ward No-01 2024-11-04
-Fixture-For-Traction-Lever-Assembly-As-Per-Icf-Drg.-No.-J&t/f-0224/01-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-C>India -Fixture-For-Traction-Lever-Assembly-As-Per-Icf-Drg.-No.-J&t/f-0224/01-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-C>Supply Of Fixture For Traction Lever Assembly As Per Icf Drg. No. J&t/f-0224/01
Fixture For Traction Lever Assembly As Per Icf Drg. No. J&t/f-0224/01 [ Warranty Period: 12 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item C
-Fixture-For-Traction-Lever-Assembly-As-Per-Icf-Drg.-No.-J&t/f-0224/01-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-C>2024-11-04
India Proposed Construction Of Modern Vegetable Market At Jeenis Road Saidapet In Div 142 Zone 10 2024-11-04
India Swir High Sensitivity And Hdr Line Scan Camera 2024-11-04
India Construction Of Four Lane Cement Concrete Pavement From Bhatkheda Via Neemuch City To Dunglawda (total Length-16.00 Km.) #1 Strengthening Of Indergarh- Pichhore Road (sh-02) (04 Lane C.c. Road, Length-01 Km.). 2024-11-04
India Comprehensive Annual Maintenance Contract For Operation And Maintenance Of Sewage Treatment Plant, Water Treatment Plant (wtp) System And Borewell Pump. 2024-11-04
India Provision Of Office Accn And Godown For Gas Agency At Af Station Amlas 2024-11-04
India Construction Work Of Additional Class Room. 2024-11-04
-Fire-Retardant-Curtain-Cloth-In-(-Brown-Colour)-Width-120-Cms-In-Minimum-Length-Of-Each-Rolls-100-+/--5-Metrs-Confirming-To-Rdso-Specification-No.-C-9911-Rev.4,-Shade-And-Pattern-As-Per-Rdso-Approved-Sample.-[>India -Fire-Retardant-Curtain-Cloth-In-(-Brown-Colour)-Width-120-Cms-In-Minimum-Length-Of-Each-Rolls-100-+/--5-Metrs-Confirming-To-Rdso-Specification-No.-C-9911-Rev.4,-Shade-And-Pattern-As-Per-Rdso-Approved-Sample.-[>Supply Of Fire Retardant Curtain Cloth
Fire Retardant Curtain Cloth In ( Brown Colour) Width 120 Cms In Minimum Length Of Each Rolls 100 +/- 5 Metrs Confirming To Rdso Specification No. C-9911 Rev.4, Shade And Pattern As Per Rdso Approved Sample. [
-Fire-Retardant-Curtain-Cloth-In-(-Brown-Colour)-Width-120-Cms-In-Minimum-Length-Of-Each-Rolls-100-+/--5-Metrs-Confirming-To-Rdso-Specification-No.-C-9911-Rev.4,-Shade-And-Pattern-As-Per-Rdso-Approved-Sample.-[>2024-11-04
India Reputed & Experienced Chartered Accountant Firms For Working As Financial Management & Accounting Support Consultant & For Further Strengthening Of Such Existing System At Bsdm. 2024-11-04
Whats app