Filter Search


Asia-Pacific


Location Summary Deadline
India Cylinder Body Assembly Complete For 203 Mm... .#* Cylinder Body Assembly Complete For 203 Mm. Bogie Mounted Air Brake Cylinder To Rds o Drg. No.- Sketch No.- 81201, Alt.- 5 And Items No.- 1,3,4,and 5 (air Inlet Position Should Be 180 Apar t On Vertical Ce 2025-09-11
Australia Winton Wetlands – Mokoan Hub 2025 2025-09-11
India Construction Of Shed Guard Room, Office Room And Toilet Block For Mrf And Wtcp At Santradaha.under 15th Fc 1st Installment Tied For The Year 2021-22 During The Year 2022-23 And 15th Fc 2nd Installment Tied For The Year 2021-22 During The Year 20 2025-09-11
-Widening-From-Two-Lane-To-Two-Lane-With-Paved-Shoulder-And-Improvements-Reconstruction-Box-Culvert-Widening-Of-Pipe-Culvert-And-Construction-Of-Drains-On-Government-Roads-In-Sathyamangalam-H-C-And-M-Sub-Division-Cbe-017>India -Widening-From-Two-Lane-To-Two-Lane-With-Paved-Shoulder-And-Improvements-Reconstruction-Box-Culvert-Widening-Of-Pipe-Culvert-And-Construction-Of-Drains-On-Government-Roads-In-Sathyamangalam-H-C-And-M-Sub-Division-Cbe-017>Cridp 2025-26
Widening From Two Lane To Two Lane With Paved Shoulder And Improvements Reconstruction Box Culvert Widening Of Pipe Culvert And Construction Of Drains On Government Roads In Sathyamangalam H C And M Sub Division Cbe 017
-Widening-From-Two-Lane-To-Two-Lane-With-Paved-Shoulder-And-Improvements-Reconstruction-Box-Culvert-Widening-Of-Pipe-Culvert-And-Construction-Of-Drains-On-Government-Roads-In-Sathyamangalam-H-C-And-M-Sub-Division-Cbe-017>2025-09-11
-Strengthening-Construction-Of-Retaining-Wall-Including-Cement-Concrete-Drain-And-Reconstruction-Of-Culvert-On-Government-Roads-In-Kothagiri-H-C-And-M-Sub-Division-Cbe-020>India -Strengthening-Construction-Of-Retaining-Wall-Including-Cement-Concrete-Drain-And-Reconstruction-Of-Culvert-On-Government-Roads-In-Kothagiri-H-C-And-M-Sub-Division-Cbe-020>Cridp 2025 - 2026
Strengthening Construction Of Retaining Wall Including Cement Concrete Drain And Reconstruction Of Culvert On Government Roads In Kothagiri H C And M Sub Division Cbe 020
-Strengthening-Construction-Of-Retaining-Wall-Including-Cement-Concrete-Drain-And-Reconstruction-Of-Culvert-On-Government-Roads-In-Kothagiri-H-C-And-M-Sub-Division-Cbe-020>2025-09-11
-Repair-To-Area-Drainage,-Path,-Interlocking-Tiles-And-Certain-Misc-Repairs-In-Firing-Range-In-Tech>India -Repair-To-Area-Drainage,-Path,-Interlocking-Tiles-And-Certain-Misc-Repairs-In-Firing-Range-In-Tech>Repair To Area Drainage, Path, Interlocking Tiles And Certain Misc Repairs In Firing Range In Tech Area And Provn Of Sand Filling/sga At Af Stn Naliya
Repair To Area Drainage, Path, Interlocking Tiles And Certain Misc Repairs In Firing Range In Tech
-Repair-To-Area-Drainage,-Path,-Interlocking-Tiles-And-Certain-Misc-Repairs-In-Firing-Range-In-Tech>2025-09-11
India Tender Invited For Retro-fitment Of Supply, Installation & Commissioning Of Automatic Swing (swivelling) Type Door Locking & Opening Mechanism In The Rake Of (12235/36 & 22460/59) Having 28 Coaches (rake No. 1) As Per Rdso Specification :- Rdso/2014/cg-03 2025-09-11
India Bracket Forging (oil Manifold) As Per Drawing As Per Drg.no. 9571626 Alt ac As Per Specn. Misc:701 .#* Bracket Forging (oil Manifold) As Per Drg.no. 9571626 Alt Ac Specn: Misc:701 [ warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-11
India Set Of Pu Connectors (pneumatic Connectors/fittings), (1) Equal Union Straight pneumatic Connector For 6mm Od Pu Tube (push Fitting) - Qty - 50 Nos, (2) Equal elbow Pneumatic Connectors For 6 Mm Od Pu Tube (push Fitting) - Qty - 50 Nos, (3) equal Elbow Pn 2025-09-11
India Pneumatic/air Hose .#* Pneumatic / Air Hose, Size: 12.5 Mm (5 Ply) In Length Of 15 Metres.drawing No.- Materia and Specification - Is:446 / 2017, Or Latest, Type 3. [ Warranty Period: 30 Months After The Date Of D elivery ] ] 2025-09-11
Whats app