Filter Search


Asia-Pacific


Location Summary Deadline
India Supply, Installation, Testing And Commissioning Of Train Management System (tms) And Its Associated Station Equipment At Various Stations Of Mumbai Division of Central Railway. Supply, Installation, Testing And Commissioning Of Train Management System (tm 2025-11-21
Japan Form Filled Fenders 9 Other Items 2025-11-21
India Vendors Approved By Any Centralized Vendor Approving Agencies For Developmental Orders With Condition Of Prototype Approval And/or Field Trial May Be Given Developmental Order For 5% Of Net Procurable Quantity (npq) Within Or Outside Npq. However, The Tot 2025-11-21
India Bracket Fan 225 Mm Sweep .#* Bracket Fan 225 Mm Sweep, 110 V Ac Conforming To Rdso Specification No. Is: 6680-92 With annexure-h [december 2005] For Rc Fan Issued By Rdso Lr.no.qe/6.5.1 Dated 10/03/2006. The Fan Base, motor Body And Bracket Shall Conform 2025-11-21
Japan A: Electricity Used In The Toba Shokusho College Building Area: Contracted Power: 332kw; Planned Contracted Energy Usage: 1,196,787kwh; B: Electricity Used In The Toba Shokusho College Boat Reserved Area: Contracted Power: 153kw; Planned Contracted Energy 2025-11-21
Japan Fy2025: Complete Set Of Work Environment Improvement Work For The Agency For Tourism (e-bidding Eligible) 2025-11-21
Japan Gas To Be Used In Kyushu University Hospital Campus 1 Set 2025-11-21
Japan Bid Announcement (general Goods And Services): Procurement Of Networks And Other Equipment For International Collaboration (domestic) Procurement Of Networks And Other Equipment For International Collaboration (domestic) 2025-11-21
Japan Removal And Return Of Government Information Network System, 1 Set 2025-11-21
India Medium Density Foam Rubber Tape .#* Medium Density Foam Rubber Tape Of X-section 6x12 Mm (without Glue) As Per No te 4 Of Drawing Lw54137 Alt C And Specification Mdts 030. [ Warranty Period: 30 Months After Th e Date Of Delivery ] ] 2025-11-21
Whats app