Filter Search


Asia-Pacific


Location Summary Deadline
Thailand Procurement Of Parcel Shortages (nor. 1, Mae Sai (son) (sor) (s) 66/2568) 2025-08-11
India Tender Invite For Primary Spring Outer (wag-7), As Per Rdso Drg. No. Skvl-039 Alt. 6 Or Latest, Confirming To Rdso Spec. No. Mp.0.4900.12 Rev.05 Of December 2020 Or Latest. [ Warranty Period: 60 Months After The Date Of Delivery ][quantity Tolerance (+/-) 2025-08-11
Thailand Buy Spare Parts To Modify The Hydraulic Oil Filter (filter Return) Of The Eti Palfinger Light Cable Car. 2025-08-11
Thailand Buy Spare Parts And Hiring A Cable Car To Cure Power Cable Car, Altec And Versalift Products In Accordance With The Practice Plan For 2025 In The Cef 2, Specific Methods. 2025-08-11
India Supply Of Earth Return Brush Holder Assembly (scope Of Supply As Per Sheet No.9) As Per Clw Spec.no.clw/es/3/0017alt. D Or Latest [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total P 2025-08-11
-Rubber-Based-Adhesive,-Specn.is:2561/1963-(reaffirmed-2018)-(shelf-Life-12-Months)-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total>India -Rubber-Based-Adhesive,-Specn.is:2561/1963-(reaffirmed-2018)-(shelf-Life-12-Months)-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total>Tender Invited For Rubber Based Adhesive,
Rubber Based Adhesive, Specn.is:2561/1963 (reaffirmed-2018) (shelf Life 12 Months) [ Warranty Period: 12 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total
-Rubber-Based-Adhesive,-Specn.is:2561/1963-(reaffirmed-2018)-(shelf-Life-12-Months)-[-Warranty-Period:-12-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total>2025-08-11
India Expression Of Interest (eoi) From Reputed Contractors Having Experience In Expressway/ Highway/ Irrigation/ Railway/ Metro/ High Speed Rail/ Power Sector India/ Overseas 2025-08-11
Thailand Construction Bidding The Construction Of 22 Kv Distribution System, According To The Por. 2 Project, Plan 3 (turnkey) At Nong Samet Intersection-ao Yai Temple (part 2), 7.870 Cyles Of Work-km. 2025-08-12
Thailand Selling By Specific Methods, Damaged Parcels And Scraps Of Memes, Damaged, Various Sizes 1. 1 Rotating Meter, 401 Damaged Phase 2. E. 1 Phase 2 Phase Damaged. 3. Tou Meter 1 Phase Damaged 14 Machines. 4. 3 Phase Meter 4 Cables. Code 1060050107 Damaged 2 D 2025-08-12
Thailand Fuel Fuel, Diesel, Car Registration, 2 B -7416, Bangkok. 2025-08-12
Whats app