Filter Search


Asia-Pacific


Location Summary Deadline
India Supply, Installation, Testing, Commissioning And Training Of Electrical, Plumbing And Fire Protection Works For 19 Underground Stations From Madhavaram Milk Colony Station To Royapettah Govt Hospital Station Including Bored Tunnel Between Stations (ch. 76 2025-08-07
-Single-Core-Cable-4gkw-ax25,1800v,-Bk,-As-Per-Clw's-Specn.no.clw/es/3/0458/e-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>India -Single-Core-Cable-4gkw-ax25,1800v,-Bk,-As-Per-Clw's-Specn.no.clw/es/3/0458/e-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>Tender Invited For Single Core Cable 4gkw-ax25,1800v, Bk
Single Core Cable 4gkw-ax25,1800v, Bk, As Per Clw's Specn.no.clw/es/3/0458/e [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal
-Single-Core-Cable-4gkw-ax25,1800v,-Bk,-As-Per-Clw's-Specn.no.clw/es/3/0458/e-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>2025-08-07
India C/o Sos Mess With 45 Suites 2025-08-07
Japan Renovation Of The House Of Representatives Office Telephone Switchboard Equipment 2025-08-07
Thailand Contract For Construction Labor Costs Only For The Expansion Of The Electricity Distribution System, Allocated To Palm Garden Chiang Mai Co., Ltd 2025-08-07
-Station-Including-Bored-Tunnel-Between-Stations-(>India -Station-Including-Bored-Tunnel-Between-Stations-(>Supply, Installation, Testing, Commissioning And Training Of Electrical, Plumbing And Fire Protection Works For 19 Underground Stations From Madhavaram Milk Colony Station To Royapettah Govt Hospital
Station Including Bored Tunnel Between Stations (
-Station-Including-Bored-Tunnel-Between-Stations-(>2025-08-07
India Supply, Testing & Commissioning Of 12 Watt Led Based Solar Street Light, 75 Wp Solar Panel, With All Allied Items 2025-08-07
India C/o Sos Mess With 45 Suites 2025-08-07
India Supply Of Goods And Articles Ready To Use Electrochemically Solution With Neu Water Technology Releasing Active Chlorine Released 100 Ppm Active-hocl (0.003%) With Naocl + Nacl (0.1%), Purified Water 99.9% Neutral Ph For Wound Care Releasing And Irrigatio 2025-08-08
Thailand Procurement Of Secondary Materials For The Construction/improvement Of The Distribution System In 2025 Of Egat 2, Type Of Cable Tie Equipment, 14 Items 2025-08-08
Whats app