Filter Search


Asia-Pacific


Location Summary Deadline
India Tender Invited For Ferric Chloride-liquid##quantity: 100000## 2025-09-10
India Chute Fixing Arrangement For Wash Basin Outlet Pipe. .#* Chute Fixing Arrangement For Wash Basin Outlet Pipe To Icf Drg. No. Gs2-6-3-206, Alt - J / 6, Col. I. Material & Specification As Per Drawing. [ Warranty Period: 30 Months After The Date Of Deli ver 2025-09-10
India Invited Tender For Cf-1/general-97: Movement Card. Finished Size 21.10 Cm X 29.80 Cm. (plus Minus 2 Mm Tolerance) Paper To Be Used Pulp Board White 275 Gsm To Is 4664/1986 Or Latest. The Card To Be Printed In Hindi & English Bilingual In Single Color On O 2025-09-10
India Seal Outer .#* Seal Outer To Drg No.emd Part No 8405527 Rev-f2 To Spec. Ems-9 Rev-e, Ms436 1 Rev-aa [ Warranty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: 2025-09-10
-Servicing-Dismantling-Calibration-Alignment-Of-Rotork-Auma-Ai-Mi-Make-Electric-Actuators-In-Unit-2-At-Dcrtpp-Hpgcl-Yamuna-Nagar>India -Servicing-Dismantling-Calibration-Alignment-Of-Rotork-Auma-Ai-Mi-Make-Electric-Actuators-In-Unit-2-At-Dcrtpp-Hpgcl-Yamuna-Nagar>Servicing/ Dismantling/cali...
Servicing Dismantling Calibration Alignment Of Rotork Auma Ai Mi Make Electric Actuators In Unit 2 At Dcrtpp Hpgcl Yamuna Nagar
-Servicing-Dismantling-Calibration-Alignment-Of-Rotork-Auma-Ai-Mi-Make-Electric-Actuators-In-Unit-2-At-Dcrtpp-Hpgcl-Yamuna-Nagar>2025-09-10
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-40-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash>India -Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-40-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash>Wbphed/ee/md/niet_21 (2nd Call) Of 2025-2026, Sl. No. 08
Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 40 M3hr. Capacity Pressure Type Iron Elimination Plant With Construction Of Blower Room Backwash
-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-40-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With-Construction-Of-Blower-Room-Backwash>2025-09-10
India Provision Of Landslide Mitigation Works At Various Locations At Ina Ezhimala At Ina Ezhimala ,2.0 ,preparing The Slope By Dressing Of Soil By Removing Debris From Slope Surface Incl Cutting The Bushes Which Effect The Area Etc Complete All As Directed By 2025-09-10
Singapore Provision Of Supply, System Integration And Commissioning Of 4 Sensor Buoys And 4 Spare Buoys 2025-09-10
India Const. Cc Road Ward No 40 Diffrent Place Muncipal Area Chhatarpur 2025-09-10
Australia Atn The Provision Of Oils, Lubricants And Coolant For Transport Canberra Buses 2025-09-10
Whats app