Filter Search


Asia-Pacific


Location Summary Deadline
-Spare-For-Manual-Release-Assembly-Of-C3w-Design-Dv-Consisting-Of-8-Items-As-Per-Annexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Cat>India -Spare-For-Manual-Release-Assembly-Of-C3w-Design-Dv-Consisting-Of-8-Items-As-Per-Annexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Cat>Supply Of Spare For Manual Release Assembly Etc.
Spare For Manual Release Assembly Of C3w Design Dv Consisting Of 8 Items As Per Annexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Cat
-Spare-For-Manual-Release-Assembly-Of-C3w-Design-Dv-Consisting-Of-8-Items-As-Per-Annexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Cat>2024-11-11
India Image Conversion And Backup Of Physical Files And Other Documents With Dms 2024-11-11
Japan Hospital Information System 1 Set 2024-11-11
-Manufacturing-And-Supply-Of-52-Kg-Special-Machine-Check-Rails-9.5-M-Long-According-To-Rdso-Drg.-No.-T-4215-As-Amended-Up-To-Date-For-Use-With-Pre-Stressed-Concrete>India -Manufacturing-And-Supply-Of-52-Kg-Special-Machine-Check-Rails-9.5-M-Long-According-To-Rdso-Drg.-No.-T-4215-As-Amended-Up-To-Date-For-Use-With-Pre-Stressed-Concrete>Supply Of Running Contract For Special Machine Check Rails 9.5m Long, 52 Kg. (t-4215)
Manufacturing And Supply Of 52 Kg Special Machine Check Rails 9.5 M Long According To Rdso Drg. No. T-4215 As Amended Up To Date For Use With Pre Stressed Concrete
-Manufacturing-And-Supply-Of-52-Kg-Special-Machine-Check-Rails-9.5-M-Long-According-To-Rdso-Drg.-No.-T-4215-As-Amended-Up-To-Date-For-Use-With-Pre-Stressed-Concrete>2024-11-11
-Bogie-Centre-Pivot-Top-For-Casnub-Bogie-To-Rdso's-Drg.-No.-Wd-85079-s/2,-Item-No.--2,-Alt.-No.--27.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -Bogie-Centre-Pivot-Top-For-Casnub-Bogie-To-Rdso's-Drg.-No.-Wd-85079-s/2,-Item-No.--2,-Alt.-No.--27.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Bogie Centre Pivot Top For Casnub Bogie Etc.
Bogie Centre Pivot Top For Casnub Bogie To Rdso's Drg. No. Wd-85079-s/2, Item No. -2, Alt. No. -27. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-Bogie-Centre-Pivot-Top-For-Casnub-Bogie-To-Rdso's-Drg.-No.-Wd-85079-s/2,-Item-No.--2,-Alt.-No.--27.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-11
India Emergent Repair & Rectification Of Distribution Wiring Of Wooden Block Incl. S&f Of Rccb & Mcb With Allied Electrical Works At Aranya Tp In The Dist Of Alipurduar Under Wbtdcl During Lhe Year Of 2024-25. Mosquito Netting, Door Sill, H.anger And Other Alli 2024-11-11
-Supply-Delivery-,installation-Of-Sluice-Gate-Valve-At-Glr-Site-Of-Tapan-Eastern-Sector-Under-Sub-Surface-Water-Based-Piped-Water-Supply-Scheme-Under-Malda-Mechanical-Division,-Phe-Dte,-Malda.>India -Supply-Delivery-,installation-Of-Sluice-Gate-Valve-At-Glr-Site-Of-Tapan-Eastern-Sector-Under-Sub-Surface-Water-Based-Piped-Water-Supply-Scheme-Under-Malda-Mechanical-Division,-Phe-Dte,-Malda.>Wbphed/ee/mlmd/niet_17 Of 2024-25
Supply Delivery ,installation Of Sluice Gate Valve At Glr Site Of Tapan Eastern Sector Under Sub Surface Water Based Piped Water Supply Scheme Under Malda Mechanical Division, Phe Dte, Malda.
-Supply-Delivery-,installation-Of-Sluice-Gate-Valve-At-Glr-Site-Of-Tapan-Eastern-Sector-Under-Sub-Surface-Water-Based-Piped-Water-Supply-Scheme-Under-Malda-Mechanical-Division,-Phe-Dte,-Malda.>2024-11-11
Japan Integrated Monitoring System 1 Set 2024-11-11
India Overhauling Kit For Lru, Control Portion; Er 787776-1994 (er-cp) Of M/s. Knorr-bremse Make Ccb As Per Annexure [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2024-11-11
Japan Supply Of 4, 071 Copies Of The Registration Law No. 7, 1999 And Other Documents 2024-11-11
Whats app