Filter Search


Asia-Pacific


Location Summary Deadline
India Regarding Laying A New Drainage Line From House No. 29 To 05 In Gumasta Nagar, Under Zone No. 15, Ward No. 83. Second Call 2025-09-23
India Construction Of W.b.m. Road At Ward No. 01, 02, 03, 04. And 05 Work Name And Place As Per Attched Estimate Nagar Parishad Sarai Distt. -singrauli (m.p.) 2025-09-23
India Regarding Laying A New Drainage Line In Place Of The Damaged Drainage Line In Balai Mohalla Basti And Surrounding Areas, Under Zone No. 11, Ward No. 48. Second Call 2025-09-23
India Construction Of Community Toilet Near Tehsil Office Sbm 2.0 Scheme In Ward No. 04 Nagar Parishad Sarai Distt. -singrauli (m.p.) 2025-09-23
India Laying The Dwc Pipeline And Taping The Outfall From 02 Culvert To Dev Nagar Culvert Located Under Zone No. 09 Ward No. 45 (fifth Call) 2025-09-23
India Construction Of W.b.m. Road At Ward No. 11, 12, 13, 14. And 15 (work Name And Place As Per Attched Estimate) Nagar Parishad Sarai Distt. -singrauli (m.p.) 2025-09-23
India 1. Mahuli-pouniya Road Length 2.40 Km. Proposed 2.40 Km. 2. Sadabodi Bonkatta Road Length 3.50 Km. 3. Choukhandi Dhabkosa Road Length 1.50 Km. 4. Varud Sirpur Road Length 1.90 Km. 5. Varud Tekadi Road Length 2.30 Km. 6. Mohgaon Sukdighat Road L.4.00 2025-09-23
India Construction Of W.b.m. Road At Ward No. 06, 07, 08, 09. And 10 (work Name And Place As Per Attched Estimate) Nagar Parishad Sarai Distt. -singrauli (m.p.) 2025-09-23
India Construction Of Anjanbihari, Ramjitola, Jamuntola, Chakaheti, Jamrapani Road Total Length 8.50 Km. (including Pole Shifting And Electrical Work) 2025-09-23
India Reconstruction Of Pandhurna Rajorakalan Pilapur Mh Border Road Length 11.30 Km Including Electrification Work. 2025-09-23
Whats app