Filter Search


Asia-Pacific


Location Summary Deadline
-Emergency-Exit-Pull-Handle-For-Lhb-Coaches-As-Per-W.r-Drg.no.-C/lhb-003/c.-[warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age>India -Emergency-Exit-Pull-Handle-For-Lhb-Coaches-As-Per-W.r-Drg.no.-C/lhb-003/c.-[warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age>Supply Of Emergency Exit Pull Handle For Lhb Coaches As Per W.r Drg.no. C/lhb-003/c.
Emergency Exit Pull Handle For Lhb Coaches As Per W.r Drg.no. C/lhb-003/c. [warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age
-Emergency-Exit-Pull-Handle-For-Lhb-Coaches-As-Per-W.r-Drg.no.-C/lhb-003/c.-[warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age>2024-11-04
India Repairing/rehabilitation With Up-gradation Or Replacement By New Unit With Up- Gradation Of Out Of Warranty Defective Different Make Erru Of 25kw To Rev-3 Or Latest Of Rdso Spec. No. Rdso/pe/spec/ac/0013-2011(rev-3). 2024-11-04
-Construction-Work-Of-New-Kitchen,-Painting-Related-Work-And-Replacement-Of-Broken-Rain>India -Construction-Work-Of-New-Kitchen,-Painting-Related-Work-And-Replacement-Of-Broken-Rain>Construction Work Of New Kitchen, Painting Related Work Of Unit Bachelor Barrack And Replacement Of Broken Rain Water Pipe In Cisf Colony, Pipri, Sonebhadra U.p.
Construction Work Of New Kitchen, Painting Related Work And Replacement Of Broken Rain
-Construction-Work-Of-New-Kitchen,-Painting-Related-Work-And-Replacement-Of-Broken-Rain>2024-11-04
-Irs-Type-Door-Lock-Complete-(-L.h.-&-R.h.-)-Drg.-No.-La51103-Alt-b-,-Qty.-50%-L.h.-And-50%-R.h.-.matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Toleran>India -Irs-Type-Door-Lock-Complete-(-L.h.-&-R.h.-)-Drg.-No.-La51103-Alt-b-,-Qty.-50%-L.h.-And-50%-R.h.-.matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Toleran>Supply Of Irs Type Door Lock Complete ( L.h. & R.h. )
Irs Type Door Lock Complete ( L.h. & R.h. ) Drg. No. La51103 Alt-b , Qty. 50% L.h. And 50% R.h. .matl.&spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Toleran
-Irs-Type-Door-Lock-Complete-(-L.h.-&-R.h.-)-Drg.-No.-La51103-Alt-b-,-Qty.-50%-L.h.-And-50%-R.h.-.matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Toleran>2024-11-04
India Replacement Of Tin Roofing Of Police Motor Transport At Mohanpura Under Sd-ii, Pbnd 2024-11-04
-Installation-Of-Transformer.-
-Electric-Power-Connection-Work.>India
-Installation-Of-Transformer.-
-Electric-Power-Connection-Work.>Erection Of Line.
Installation Of Transformer.
Electric Power Connection Work.
-Installation-Of-Transformer.-
-Electric-Power-Connection-Work.>2024-11-04
India Supply Of Email Backup Solution. 2024-11-04
-Longitude-Side-To-Llh's-Drg.-No.uf/m-327,-Alt-No.--4.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs]>India -Longitude-Side-To-Llh's-Drg.-No.uf/m-327,-Alt-No.--4.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs]>Supply Of Longitude Side Etc.
Longitude Side To Llh's Drg. No.uf/m-327, Alt No.- 4. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 Lacs]
-Longitude-Side-To-Llh's-Drg.-No.uf/m-327,-Alt-No.--4.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:-Max-8-Lacs]>2024-11-04
India Construction Work Of Class Room. 2024-11-04
Korea Republic of Geumjeong-gu Living Waste Collection And Transportation Agency Service (2nd District) 2024-11-04
Whats app