Filter Search


Asia-Pacific


Location Summary Deadline
India Installation Of 7 Nos Solar Street Light At Bharadihi Village 2nd Phase Jl No 68 2026-01-08
India Estimate For Power Supply To 1no. 06kw Ndl&f Connection For "new Mangal Bhawan" At Chhuikhadan (ward No. 01, Near Jain Petrol Pump) Under Chhuikhadan D/c. 2026-01-08
India Providing Series Of Studs And Revetment On R/s Of River Beas Along 2000 Feet Length To Project Village Abadies And Culturable Land Village Kirriyan. 2026-01-08
India Operation And Maintenance Of Existing 08 Mld Stp (based On Sbr Technology ) At Devpura Bundi For 3 Years M.c. Bundi 2026-01-08
-Operation-And-Guarding-Of-Pumping-Machinery-At-Hasludanga-W/s-Scheme,-Block-Maynaguri,-In-The-District-Of-Jalpaiguri-Under-Northern-Mechanical-Division,-P.h.-Engineering-Dte.>India -Operation-And-Guarding-Of-Pumping-Machinery-At-Hasludanga-W/s-Scheme,-Block-Maynaguri,-In-The-District-Of-Jalpaiguri-Under-Northern-Mechanical-Division,-P.h.-Engineering-Dte.>Wbphed/ee/nmd/niet- 14 Of 2025-2026 Slno 154
Operation And Guarding Of Pumping Machinery At Hasludanga W/s Scheme, Block Maynaguri, In The District Of Jalpaiguri Under Northern Mechanical Division, P.h. Engineering Dte.
-Operation-And-Guarding-Of-Pumping-Machinery-At-Hasludanga-W/s-Scheme,-Block-Maynaguri,-In-The-District-Of-Jalpaiguri-Under-Northern-Mechanical-Division,-P.h.-Engineering-Dte.>2026-01-08
India Canvas Aprons Olivegreen .#* Canvas Aprons As Per Specification Mcf-rbl-68-001 Is Attached Herewith (pil ot Sample To Be Approved By Consignee Before Bulk Supply). [ Warranty Period: 30 Months after The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age 2026-01-08
-Supply-Of-Av-Equipment-And-Installation-At-Biermann-Gate-6,-Oslo>India -Supply-Of-Av-Equipment-And-Installation-At-Biermann-Gate-6,-Oslo>Supply Of Av Equipment And Installation
Supply Of Av Equipment And Installation At Biermann Gate 6, Oslo
-Supply-Of-Av-Equipment-And-Installation-At-Biermann-Gate-6,-Oslo>2026-01-08
India Construction Of Pcc Road From House Of Basu Das To Mahesh Burnwal At Khandra Biseswari Under Khandra G.p. Sansad No-xviii, Booth No-164, Source Of Fund-apas, 2025-26 2026-01-08
-Supply-Of-Centrifugal-Partition-Chromatography-And-Preparative-Lc-ms-System>India -Supply-Of-Centrifugal-Partition-Chromatography-And-Preparative-Lc-ms-System>Centrifugal Partition Chromatography And Preparative Lc-ms System
Supply Of Centrifugal Partition Chromatography And Preparative Lc-ms System
-Supply-Of-Centrifugal-Partition-Chromatography-And-Preparative-Lc-ms-System>2026-01-08
India Tender Invited For Boiler Bed Coil Pipes Size: 50.8mm Od X 4.5mm For Second (02) & Third (03) Row Tubes , Boiler Bed Coil Pipes Size: 50.8mm Od X 4.5mm Thick For First (01) & Fourth(04) Row Tubes##quantity: 120## 2026-01-08
Whats app