Filter Search


Asia-Pacific


Location Summary Deadline
India Consultancy Services For Preparation Of Dpr For 4 Laning From Km 0.00 To 10.32 And Km 78.20 To 133.20 Of Nh-136 (thanjavur- Perambalur-attur Road) Including Construction Of Two Robs At Km 0.60 (lc-300a) And Km 133.20 (lc-131) Of Nh-136 In Tamil Nadu. 2024-11-04
Mongolia Ovatsg/20240102001 2024-11-04
-1-Kvar-Metalized-Polypropylene-Gas-Filled,-Wavy-Cut-Three-Phase,-Self-Healing-Type-Capacitor,-Rated-At-480v,-50hz,-Rated-Current-1.2-Amps,-Capacitor-Should-Have-Discharge-Res>India -1-Kvar-Metalized-Polypropylene-Gas-Filled,-Wavy-Cut-Three-Phase,-Self-Healing-Type-Capacitor,-Rated-At-480v,-50hz,-Rated-Current-1.2-Amps,-Capacitor-Should-Have-Discharge-Res>Supply Of 1 Kvar Metalized Polypropylene Gas Filled, Wavy Cut Three Phase,
1 Kvar Metalized Polypropylene Gas Filled, Wavy Cut Three Phase, Self Healing Type Capacitor, Rated At 480v, 50hz, Rated Current 1.2 Amps, Capacitor Should Have Discharge Res
-1-Kvar-Metalized-Polypropylene-Gas-Filled,-Wavy-Cut-Three-Phase,-Self-Healing-Type-Capacitor,-Rated-At-480v,-50hz,-Rated-Current-1.2-Amps,-Capacitor-Should-Have-Discharge-Res>2024-11-04
-Manual-Uncoupling-Device-For-Cbc-Fitted-With-Coaching-Stock,-Material-&-Specification-:-Rdso's-Specification-No.-Rdso/2011/cg-03-(rev.-03).-[-Warranty-Period:-84-Months-After-The-Date-Of-Delivery]-]>India -Manual-Uncoupling-Device-For-Cbc-Fitted-With-Coaching-Stock,-Material-&-Specification-:-Rdso's-Specification-No.-Rdso/2011/cg-03-(rev.-03).-[-Warranty-Period:-84-Months-After-The-Date-Of-Delivery]-]>Supply Of Manual Uncoupling Device For Cbc
Manual Uncoupling Device For Cbc Fitted With Coaching Stock, Material & Specification : Rdso's Specification No. Rdso/2011/cg-03 (rev.-03). [ Warranty Period: 84 Months After The Date Of Delivery] ]
-Manual-Uncoupling-Device-For-Cbc-Fitted-With-Coaching-Stock,-Material-&-Specification-:-Rdso's-Specification-No.-Rdso/2011/cg-03-(rev.-03).-[-Warranty-Period:-84-Months-After-The-Date-Of-Delivery]-]>2024-11-04
India Renewal Of Jath Jamboti Sh-31 From Ch 104.53 (gokak Rto Office) To 106.80 (maladinni Cross) In Gokak Taluka Of Belagavi District(crif-knt-2023-24-053) 2024-11-04
India Annual Rate Basis Work Shall Consist Of Construction Of New Cross Drainage, Repairing Of Cross Drainage, Structure & Bridge Works & Other Miscellaneous Work On Various Road As & When Required Or In Emergency Under Dang District (panchayat) Annual Basis, A 2024-11-04
India Supply Of Glycopyrrolate 0.5 Mg + Neostigmine 2.5 Mg/5 Ml Inj. (myo Pyrollate) ] 2024-11-04
-Annual-General-Maintenance-And-Repair-Of-Civil-Works-An>India -Annual-General-Maintenance-And-Repair-Of-Civil-Works-An>Annual General Maintenance And Repair Of Civil Works And General Sewerage And Sweeping Related Works For Two Years In U.p.r.v.u.n.l. Jal Vidyut Unit Obra Residential Colony Obra Sonebhadra U.p.
Annual General Maintenance And Repair Of Civil Works An
-Annual-General-Maintenance-And-Repair-Of-Civil-Works-An>2024-11-04
India Selection Of Agency For Supply, Installation And Commissioning And Operation, Maintenance Of Mri 1.5 Tesla And Ct Scan 32 Slices For Selected Location In Jharkhand On Trun-key Basis For 5 Years 2024-11-04
India Design And Development And Implementation Of Audio Tours Across Various Destinations In Tamil Nadu 2024-11-04
Whats app