Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Boundary-Wall,-Pump-House-And-Toilet,sedel-Room,-Laying-Hdpe-Pipe-Line-Of-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Supply-Scheme-(zone-e)-Under-Onda>India -Construction-Of-Boundary-Wall,-Pump-House-And-Toilet,sedel-Room,-Laying-Hdpe-Pipe-Line-Of-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Supply-Scheme-(zone-e)-Under-Onda>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-13)
Construction Of Boundary Wall, Pump House And Toilet,sedel Room, Laying Hdpe Pipe Line Of Aguri Band Punisol And Adjoining Mouzas Water Supply Scheme (zone-e) Under Onda
-Construction-Of-Boundary-Wall,-Pump-House-And-Toilet,sedel-Room,-Laying-Hdpe-Pipe-Line-Of-Aguri-Band-Punisol-And-Adjoining-Mouzas-Water-Supply-Scheme-(zone-e)-Under-Onda>2024-11-25
India Supply, Installation, Testing & Commissioning Of Kavach On Gd & Gq Routes (688 Rkm) Including Associated Works On Section Of Kharagpur & Chakradharpur Division Of South Eastern Railway 2024-11-25
-Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Anandapur-Intake-Site-For-Augmentation-Of-Sub-Surface-Wat>India -Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Anandapur-Intake-Site-For-Augmentation-Of-Sub-Surface-Wat>Niet No - 21 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call)(sl.no-11)
Construction Of Pump House Including Plinth Protection, Ramp Etc. According To Departmental Design And Drawing At Anandapur Intake Site For Augmentation Of Sub Surface Wat
-Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Anandapur-Intake-Site-For-Augmentation-Of-Sub-Surface-Wat>2024-11-25
-Stopper-Assembly-For-Pin-For-Brake-Block-Hanger-Bracket-To-Icf-Drg.-No.-T-0-3-676-Alt.-c/3.-Matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity>India -Stopper-Assembly-For-Pin-For-Brake-Block-Hanger-Bracket-To-Icf-Drg.-No.-T-0-3-676-Alt.-c/3.-Matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity>Supply Of Stopper Assembly For Pin For Brake Block Hanger Bracket
Stopper Assembly For Pin For Brake Block Hanger Bracket To Icf Drg. No. T-0-3-676 Alt.-c/3. Matl.&spec. As Per Drg. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity
-Stopper-Assembly-For-Pin-For-Brake-Block-Hanger-Bracket-To-Icf-Drg.-No.-T-0-3-676-Alt.-c/3.-Matl.&spec.-As-Per-Drg.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity>2024-11-25
-Subsea-Production-System-At-Chandrika-And-Gs-49-Kakinada-Eoa>India -Subsea-Production-System-At-Chandrika-And-Gs-49-Kakinada-Eoa>Subsea Production System
Subsea Production System At Chandrika And Gs-49 Kakinada Eoa
-Subsea-Production-System-At-Chandrika-And-Gs-49-Kakinada-Eoa>2024-11-25
-Piston-Seal-(modified)-For-Reverser,winding-Change-Over-Switch-And-Tap-Changer-Contactors-Of-Bhel-Emus-As-Per-M/s-Bhel's-Drg.no.-2580>India -Piston-Seal-(modified)-For-Reverser,winding-Change-Over-Switch-And-Tap-Changer-Contactors-Of-Bhel-Emus-As-Per-M/s-Bhel's-Drg.no.-2580>Supply Of Piston Washer (modified) For Reverser,winding Change Over Switch And Tap Changer Contactors Of Bhel Emus.
Piston Seal (modified) For Reverser,winding Change Over Switch And Tap Changer Contactors Of Bhel Emus As Per M/s Bhel's Drg.no. 2580
-Piston-Seal-(modified)-For-Reverser,winding-Change-Over-Switch-And-Tap-Changer-Contactors-Of-Bhel-Emus-As-Per-M/s-Bhel's-Drg.no.-2580>2024-11-25
Korea Republic of Gangneung City Integrated Public Rental Housing Construction Project Basic And Detailed Design Service Design Competition 2024-11-25
India Construction Of Cwr & Pump House At Ohr Site Under Augmentation Of (mukutmanipur, Khatra & ranibundh) Zone- Viii/a Water Supply Scheme Under Khatra Sub- Division Division, P.h.e. Dte. 2024-11-25
-Construction-Of-High-Lift-Pump-House-And-Boundary-Wall-Under-Augmentation-Works-For-Godardihi-(zone--E)-Under-Bankura---I,-Ii,-Barjora-Block-Water-Supply-Scheme-(brgf-Ph>India -Construction-Of-High-Lift-Pump-House-And-Boundary-Wall-Under-Augmentation-Works-For-Godardihi-(zone--E)-Under-Bankura---I,-Ii,-Barjora-Block-Water-Supply-Scheme-(brgf-Ph>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-02)
Construction Of High Lift Pump House And Boundary Wall Under Augmentation Works For Godardihi (zone- E) Under Bankura - I, Ii, Barjora Block Water Supply Scheme (brgf Ph
-Construction-Of-High-Lift-Pump-House-And-Boundary-Wall-Under-Augmentation-Works-For-Godardihi-(zone--E)-Under-Bankura---I,-Ii,-Barjora-Block-Water-Supply-Scheme-(brgf-Ph>2024-11-25
-Sinking-Of-1-No-300mm-X-200mm-X-200m-Deep-Tubewell-(3rd-Tw-Site)-By-Rig-Boring-System-Method-Including-Interconnection-With-100-Mm-Dia.-G.i.-Pipe-Of-Augmentation-Of-Nabak>India -Sinking-Of-1-No-300mm-X-200mm-X-200m-Deep-Tubewell-(3rd-Tw-Site)-By-Rig-Boring-System-Method-Including-Interconnection-With-100-Mm-Dia.-G.i.-Pipe-Of-Augmentation-Of-Nabak>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-07)
Sinking Of 1 No 300mm X 200mm X 200m Deep Tubewell (3rd Tw Site) By Rig Boring System Method Including Interconnection With 100 Mm Dia. G.i. Pipe Of Augmentation Of Nabak
-Sinking-Of-1-No-300mm-X-200mm-X-200m-Deep-Tubewell-(3rd-Tw-Site)-By-Rig-Boring-System-Method-Including-Interconnection-With-100-Mm-Dia.-G.i.-Pipe-Of-Augmentation-Of-Nabak>2024-11-25
Whats app