Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Saltora-Z-i-Ohr-Site-For-Augmentation-Of-Sub-Surface-Wat>India -Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Saltora-Z-i-Ohr-Site-For-Augmentation-Of-Sub-Surface-Wat>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-15)
Construction Of Pump House Including Plinth Protection, Ramp Etc. According To Departmental Design And Drawing At Saltora Z-i Ohr Site For Augmentation Of Sub Surface Wat
-Construction-Of-Pump-House-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-At-Saltora-Z-i-Ohr-Site-For-Augmentation-Of-Sub-Surface-Wat>2024-11-25
-Dump-Valve-Connector-Assy-For-Lhb-Coaches-Ftrtipl-Part-No.-Ft0053671-102-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>India -Dump-Valve-Connector-Assy-For-Lhb-Coaches-Ftrtipl-Part-No.-Ft0053671-102-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>Supply Of Dump Valve Connector
Dump Valve Connector Assy For Lhb Coaches Ftrtipl Part No. Ft0053671-102 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Pe
-Dump-Valve-Connector-Assy-For-Lhb-Coaches-Ftrtipl-Part-No.-Ft0053671-102-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Pe>2024-11-25
-Construction-Of-Guard-Room-And-Toilet-With-Sanitary-And-Water-Supply-Arrangement-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-For-A>India -Construction-Of-Guard-Room-And-Toilet-With-Sanitary-And-Water-Supply-Arrangement-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-For-A>Niet No - 22 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call) (sl.no-10)
Construction Of Guard Room And Toilet With Sanitary And Water Supply Arrangement Including Plinth Protection, Ramp Etc. According To Departmental Design And Drawing For A
-Construction-Of-Guard-Room-And-Toilet-With-Sanitary-And-Water-Supply-Arrangement-Including-Plinth-Protection,-Ramp-Etc.-According-To-Departmental-Design-And-Drawing-For-A>2024-11-25
Japan Packet Collection, Analysis And Transfer System, 1 Set 2024-11-25
-3/8-Inch-Straight-Nipple,-Material:-Mild-Steel,-As-Per-Clw-Drg.-No.-Clw/ac/132-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -3/8-Inch-Straight-Nipple,-Material:-Mild-Steel,-As-Per-Clw-Drg.-No.-Clw/ac/132-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of 3/8 Inch Straight Nipple, Material
3/8 Inch Straight Nipple, Material: Mild Steel, As Per Clw Drg. No. Clw/ac/132 [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-3/8-Inch-Straight-Nipple,-Material:-Mild-Steel,-As-Per-Clw-Drg.-No.-Clw/ac/132-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-11-25
-Construction-Of-High-Lift-Pump-House-With-All-Allied-Works-At-Onda-(zone--Ii),-Tella-Site-Under-Rejuvenation-Of-Sub-surface-Water-Based-Water-Supply-Scheme-For-Onda-Under>India -Construction-Of-High-Lift-Pump-House-With-All-Allied-Works-At-Onda-(zone--Ii),-Tella-Site-Under-Rejuvenation-Of-Sub-surface-Water-Based-Water-Supply-Scheme-For-Onda-Under>Niet No - 21 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call)(sl.no-08)
Construction Of High Lift Pump House With All Allied Works At Onda (zone- Ii), Tella Site Under Rejuvenation Of Sub-surface Water Based Water Supply Scheme For Onda Under
-Construction-Of-High-Lift-Pump-House-With-All-Allied-Works-At-Onda-(zone--Ii),-Tella-Site-Under-Rejuvenation-Of-Sub-surface-Water-Based-Water-Supply-Scheme-For-Onda-Under>2024-11-25
-Led-Light-Fitting-For-Passenger-Alarm-Chain-Coach-Indication-Light-Conforming>India -Led-Light-Fitting-For-Passenger-Alarm-Chain-Coach-Indication-Light-Conforming>Supply Of Led Light Fitting For Passenger Alarm Chain Coach Indication Light Conforming To Specs No. Rdso/pe/spec/tl/0091-2016, Rev-1 & Rcf Drg. No. Lw 76098 Type-i (3w).
Led Light Fitting For Passenger Alarm Chain Coach Indication Light Conforming
-Led-Light-Fitting-For-Passenger-Alarm-Chain-Coach-Indication-Light-Conforming>2024-11-25
Japan Facility-cleaning Service For Hospital 1 Set 2024-11-25
Japan Geospatial Information Authority Of Japan Automatic Telephone Switching Equipment Manufacturing (electronic Bidding) 2024-11-25
-Wear-Plate-Confirming-To-Plasser-Part-No.-62.08.10085-As-Per-Rdso-Specification:-Tm/hm/6/15-Rev-2-(2015)-[-Warranty-Period:-9-Months-After-The-Date-Of-Delivery-]-]>India -Wear-Plate-Confirming-To-Plasser-Part-No.-62.08.10085-As-Per-Rdso-Specification:-Tm/hm/6/15-Rev-2-(2015)-[-Warranty-Period:-9-Months-After-The-Date-Of-Delivery-]-]>Supply Of Wear Plate Confirming To Plasser Part No. 62.08.10185
Wear Plate Confirming To Plasser Part No. 62.08.10085 As Per Rdso Specification: Tm/hm/6/15 Rev-2 (2015) [ Warranty Period: 9 Months After The Date Of Delivery ] ]
-Wear-Plate-Confirming-To-Plasser-Part-No.-62.08.10085-As-Per-Rdso-Specification:-Tm/hm/6/15-Rev-2-(2015)-[-Warranty-Period:-9-Months-After-The-Date-Of-Delivery-]-]>2024-11-25
Whats app