Filter Search


Asia-Pacific


Location Summary Deadline
Japan Washer Disinfector Set 2025-09-04
India Auction Sale Of Property, All That Portion Of Vacant House Site Bearing Plot No.61, Radha Nagar, To An Extent Of 2505 Sq. Ft. Comprised In Survey No.212/2 Part, Patta No.5714. 2025-09-04
-Construction-And-Upgradation-Of-Road-From-Jamar-To-Darga-More,-Banshihari-Block-(length-Of-The-Road-2.30-Km)>India -Construction-And-Upgradation-Of-Road-From-Jamar-To-Darga-More,-Banshihari-Block-(length-Of-The-Road-2.30-Km)>15/sf/dd/ Se/rrnmu/malda/2025-26 1st Call Sl1
Construction And Upgradation Of Road From Jamar To Darga More, Banshihari Block (length Of The Road 2.30 Km)
-Construction-And-Upgradation-Of-Road-From-Jamar-To-Darga-More,-Banshihari-Block-(length-Of-The-Road-2.30-Km)>2025-09-04
India Construction And Maintenance Of Road From L021-treru To Daggal (link Road), Package No. Jk12-4013, Pmgsy-iv, Batch-i Of 2025-26, Block-moughla, District Rajouri. (using Waste Plastic) Length-14.716 Kms 2025-09-04
India Electric Pallet Stacker .#* 1.5 Ton Fully Electric Pallet Stacker As Per Attached Specification. Make: Godrej Or Simil ar. [ Warranty Period: 12 Months After The Date Of Delivery ] ] 2025-09-04
India Eye Bolt Complete With Hex Nut, Check Nut For Bobrn Wagon To Rdso drg No : Wd-92081-s-57, Item - 2, Alt : 10. .#* Eye Bolt Complete With Hex Nut, Check Nut For Bobrn Wagon To Rdso Drg N o : Wd-92081-s-57, Item - 2, Alt : 10. [ Warranty Period: 30 Months A 2025-09-04
-Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Chirulia-Chalta-Water-Supply-Scheme-Block--Egra-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte>India -Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Chirulia-Chalta-Water-Supply-Scheme-Block--Egra-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte>Wbphe/ee/mmd/niet- 12 Of 2025-26
Day To Day Operation And Guarding Of Pumping Machinery And Others At Pump House No. Tw-i, Ii Of Chirulia Chalta Water Supply Scheme Block- Egra-i Dist.- Purba Medinipur Under Midnapore Mechanical Division, P.h.e. Dte
-Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Chirulia-Chalta-Water-Supply-Scheme-Block--Egra-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte>2025-09-04
-Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Bathuary-Water-Supply-Scheme-Block--Egra-ii-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>India -Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Bathuary-Water-Supply-Scheme-Block--Egra-ii-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>Wbphe/ee/mmd/niet- 12 Of 2025-26
Day To Day Operation And Guarding Of Pumping Machinery And Others At Pump House No. Tw-i, Ii Of Bathuary Water Supply Scheme Block- Egra-ii Dist.- Purba Medinipur Under Midnapore Mechanical Division, P.h.e. Dte.
-Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Bathuary-Water-Supply-Scheme-Block--Egra-ii-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>2025-09-04
India Electrical Work For False Ceiling Work At Drm Office Jbp And Provision Of Modular kitchen In Rb V Special Bungalows (32 Nos) In Rail Saurabh Colony Jbp 2025-09-04
India Modified Side Light Fitting .#* Modified Side Light Fitting Icf Drg.no. Icf-sk-7-6-024 Alt B [ Warranty Period: 30 Month s After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: Max 8 2025-09-04
Whats app