Filter Search


Asia-Pacific


Location Summary Deadline
India Bracket For Mounting Foot Step .#* Bracket For Mounting Foot Step On Lhb Coaches As Per Drg. No. Lw11148, Alt. B [ Warranty period: 30 Months After The Date Of Delivery ] ] 2026-01-13
India Repair, Op. And Mntc. Of Distribution System, Rising Main And Allied Pipelines, Valves, Valves Chambers, Stand Posts, Repairing Of Fhtc And Providing New Fhtc For Gabberia W/s Scheme, Sdk-ii, Under Hasnabad Sub-divn. P.h.e. Dte. For 1 Y 2026-01-13
-Upgradation-Of-Concrete-Road-From-Moula-Pal-Para-To-Bishnu-Mandir-At-Moula-Under-Booth-No-47,-J.l-No-25,-Mouza-merasole.-Scheme-Id-apas/01/258/47/0004,-Under-Dhulai-Gp-From-Apas-Fund-20>India -Upgradation-Of-Concrete-Road-From-Moula-Pal-Para-To-Bishnu-Mandir-At-Moula-Under-Booth-No-47,-J.l-No-25,-Mouza-merasole.-Scheme-Id-apas/01/258/47/0004,-Under-Dhulai-Gp-From-Apas-Fund-20>26/dhulai G.p/apas Fund/2025-26, Date-12/12/2025 (2nd Call) Sl9
Upgradation Of Concrete Road From Moula Pal Para To Bishnu Mandir At Moula Under Booth No 47, J.l No-25, Mouza-merasole. Scheme Id-apas/01/258/47/0004, Under Dhulai Gp From Apas Fund 20
-Upgradation-Of-Concrete-Road-From-Moula-Pal-Para-To-Bishnu-Mandir-At-Moula-Under-Booth-No-47,-J.l-No-25,-Mouza-merasole.-Scheme-Id-apas/01/258/47/0004,-Under-Dhulai-Gp-From-Apas-Fund-20>2026-01-13
-Repairs-To-I.p.s.-Footpath-From-2b/h/48/1-To-2b/h/57,-Dr.-M.n.c.-Sarani-In-Ward-No-28.>India -Repairs-To-I.p.s.-Footpath-From-2b/h/48/1-To-2b/h/57,-Dr.-M.n.c.-Sarani-In-Ward-No-28.>Kmc/eec/iv/a/28/b/19/9/25-26/r
Repairs To I.p.s. Footpath From 2b/h/48/1 To 2b/h/57, Dr. M.n.c. Sarani In Ward No-28.
-Repairs-To-I.p.s.-Footpath-From-2b/h/48/1-To-2b/h/57,-Dr.-M.n.c.-Sarani-In-Ward-No-28.>2026-01-13
India Renovation Of Brick Road To Cc Road From Panchayat Road To House Of Ahamad Ali At Booth No-39,bilasi Sishu Sikha Kendra At Dakshin Baidyapur Under Falti Beliaghata Gp,id-(apas/01/121/39/0010) 2026-01-13
India Tender Invited For Repair, Maintenance, And Installation Of Plant/ Systems/equipments (version 2) - Fabrication Works At Cokeoven Complex For 3 Mtpa Integrated Steel Plant At Nagarnar; Fabrication Works At Coke-oven Complex For 3 Mtpa Integrated Steel Pla 2026-01-13
-Construction-Of-Cc-Drain-From-Jahangir-House-To-Kandar-Booth-No-67,-Jl-No-122,mouza-gayeshpur-Scheme-Id-apas/01/287/67/0005-Under-Apas-Fund/25-26-Under-Sia>India -Construction-Of-Cc-Drain-From-Jahangir-House-To-Kandar-Booth-No-67,-Jl-No-122,mouza-gayeshpur-Scheme-Id-apas/01/287/67/0005-Under-Apas-Fund/25-26-Under-Sia>Construction Of Cc Drain From Jahangir House To Kandar Booth No-67, Jl No-122,mouza-gayeshpur
Construction Of Cc Drain From Jahangir House To Kandar Booth No-67, Jl No-122,mouza-gayeshpur Scheme Id-apas/01/287/67/0005 Under Apas Fund/25-26 Under Sia
-Construction-Of-Cc-Drain-From-Jahangir-House-To-Kandar-Booth-No-67,-Jl-No-122,mouza-gayeshpur-Scheme-Id-apas/01/287/67/0005-Under-Apas-Fund/25-26-Under-Sia>2026-01-13
-Salar-talibpur-Road-From-2.50-Kmp-To-4.60-Kmp-And-Barhati-To-Tenya-Railway-Station-Road-From-0.00-Kmp-To-0.80-Kmp-Repairing-Work-In-Stretches-Under-Murshidabad-Highway-Division-No.ii-During-The-Year-2025-26>India -Salar-talibpur-Road-From-2.50-Kmp-To-4.60-Kmp-And-Barhati-To-Tenya-Railway-Station-Road-From-0.00-Kmp-To-0.80-Kmp-Repairing-Work-In-Stretches-Under-Murshidabad-Highway-Division-No.ii-During-The-Year-2025-26>Eemhdii/nit8sl7/2025-26
Salar-talibpur Road From 2.50 Kmp To 4.60 Kmp And Barhati To Tenya Railway Station Road From 0.00 Kmp To 0.80 Kmp Repairing Work In Stretches Under Murshidabad Highway Division No.ii During The Year 2025-26
-Salar-talibpur-Road-From-2.50-Kmp-To-4.60-Kmp-And-Barhati-To-Tenya-Railway-Station-Road-From-0.00-Kmp-To-0.80-Kmp-Repairing-Work-In-Stretches-Under-Murshidabad-Highway-Division-No.ii-During-The-Year-2025-26>2026-01-13
India Selection Of Private Partner For Establishment Operation Maintenance And Management Of Fpms For Drugs And Medicine At Minakhan Rh 2026-01-13
-Emergent-Rep.-Of-Dilapidated-Portion-Including-Up-Gradation-Of-Floor-And-Toilets-And-Face-Lifting-Of-Gr-1st-2nd-Fl.-Cabins-Total-19-Nos-Cabin-And-Other-Ancillary-Works-At-Cardiology-Building,under-Ipgmer-sskm,-During-The-Year-24_25_e.i.-Wo>India -Emergent-Rep.-Of-Dilapidated-Portion-Including-Up-Gradation-Of-Floor-And-Toilets-And-Face-Lifting-Of-Gr-1st-2nd-Fl.-Cabins-Total-19-Nos-Cabin-And-Other-Ancillary-Works-At-Cardiology-Building,under-Ipgmer-sskm,-During-The-Year-24_25_e.i.-Wo>E.i. Work
Emergent Rep. Of Dilapidated Portion Including Up Gradation Of Floor And Toilets And Face Lifting Of Gr 1st 2nd Fl. Cabins Total 19 Nos Cabin And Other Ancillary Works At Cardiology Building,under Ipgmer-sskm, During The Year 24_25_e.i. Wo
-Emergent-Rep.-Of-Dilapidated-Portion-Including-Up-Gradation-Of-Floor-And-Toilets-And-Face-Lifting-Of-Gr-1st-2nd-Fl.-Cabins-Total-19-Nos-Cabin-And-Other-Ancillary-Works-At-Cardiology-Building,under-Ipgmer-sskm,-During-The-Year-24_25_e.i.-Wo>2026-01-13
Whats app