Filter Search


Asia-Pacific


Location Summary Deadline
India Repair Maintanance Of Damage Borewell Repair Of Submersible Pump With Washing Of Existing Boring And Extension Of Cable Trench Inside Crb Repairing Of Mumpty Room Shed And Other Allied Civil Works At Anulia 33 11kv Sub Station Under Ranaghat 2025-09-04
India Provn Of Rain Water Gutters Channel For Certain Bldgs At Hq Cif(r) Palma Grn Under Age(i) Cif(r) ,2.0 ,s&f, 150mm Bore, Pvc Rainwater (swr) Drainage Pipes Single Socketed, In Any Length With Rubber Ring Joints , Fixed To Walls Or Fixed In Brackets To Coll 2025-09-04
-Renovation-Of-D-7-Guest-House-At-India-Govt.-Mint,-Noida>India -Renovation-Of-D-7-Guest-House-At-India-Govt.-Mint,-Noida>Renovation Of D-7 Guest House
Renovation Of D-7 Guest House At India Govt. Mint, Noida
-Renovation-Of-D-7-Guest-House-At-India-Govt.-Mint,-Noida>2025-09-04
Philippines One Job Order For The Construction Of 1 Storey 2 Classroom Building Located At Asinan Elementary School, Brgy. Asinan, Matanao, Davao Del Sur All According To Plans, Specifications And Scope Of Wo 2025-09-04
India Addn/altn To Toilet At Offrs Ward Certain Maj Rev And Minor Works At Chafb ,2.0 ,common Items Applicable For Job 'a' , Job 'b', Job 'c', Job 'd', Job 'e', Job 'f' & 'g' ,demolition Of Cement Concrete (unreinforced) In Ground Floor And Pavings Not Exceedin 2025-09-04
India C/o Stage And Other Miscellaneous Works In Stadium Sundar 2025-09-04
India 29050066 - Set Of Labyrinth Ring For Nose Suspend Drive (msu Tube) Of wap7/wag9 .#* Set Of Labyrinth Ring For Nose Suspend Drive (msu Tube) Of Wap7/wag9 Consist Of 10 It ems As Per Clws Drg.no.- 1209-01.111-004 (alt.-5 Or Latest), Ref. No.- 2 & 9 To 17 Of 2025-09-04
India Tender Invited For Hi Chrome Liner For Bbd4760 Mill , Wedges / Hardware For Tightning Mill Bbd 4760 , Backing Material For Rubber Cork Sheet For Mill Bbd4760##quantity: 5## 2025-09-04
India End Cap For Axle Box As Per Clw Drg.no.1209.01-311.014 Alt.2 .#* End Cap For Axle Box As Per Clw Drg.no.1209.01-311.014 Alt.2 For Wag9 Locos. [ War anty Period: 30 Months After The Date Of Delivery ] ] 2025-09-04
Philippines Additional Works At The Socio-economic Building Phase 2 Located At Brgy. Burol Main, City Of Dasmarinas, Cavite 2025-09-04
Whats app