Filter Search


Asia-Pacific


Location Summary Deadline
India Miniature Circuit Breaker (mcb), Double Pole, Current Rating -2amps .#* Miniature Circuit Breaker (mcb), Double Pole, Current Rating -2amps, Breaking Capacity 10ka, Curve C Conforming To Rdso Specn. No. Elps/spe c/ac/04 (rev.3)-may 2009.item No.13 Accepte 2025-09-04
India Double Ended Ring Spanners Of Sizes (in Mm):size:6x7, Size: 8x9, Size: 10x11, Size: 12x13, Size:14x15, Size: 16x17, Size: 18x19,size:20x22,size:21x23, Size:24x27, size:25x28, Size:30x32, Size:36x41. Set Consisting Of 13 Nos.- Each 1 No. Make: stahlwille / 2025-09-04
New Zealand Traumatic Brain Injury Residential Rehabilitation (tbirr) Services Based In Christchurch 2025-09-04
-Dredging/de-siltation-Of-Kapaleswari-River-From-Kamarpota-Sluice-To-Nangalkata-Bridge-For-A-Length-Of-6.32-Km.-Under-No-Cost-To-State-Exchequer-Model-Within-Block-And-P.s.--Sabang,-District-Paschim-Medinipur-(2nd-Call).>India -Dredging/de-siltation-Of-Kapaleswari-River-From-Kamarpota-Sluice-To-Nangalkata-Bridge-For-A-Length-Of-6.32-Km.-Under-No-Cost-To-State-Exchequer-Model-Within-Block-And-P.s.--Sabang,-District-Paschim-Medinipur-(2nd-Call).>Wbiw/ctu/rfp-33(e)/2025-26
Dredging/de-siltation Of Kapaleswari River From Kamarpota Sluice To Nangalkata Bridge For A Length Of 6.32 Km. Under No Cost To State Exchequer Model Within Block And P.s.- Sabang, District Paschim Medinipur (2nd Call).
-Dredging/de-siltation-Of-Kapaleswari-River-From-Kamarpota-Sluice-To-Nangalkata-Bridge-For-A-Length-Of-6.32-Km.-Under-No-Cost-To-State-Exchequer-Model-Within-Block-And-P.s.--Sabang,-District-Paschim-Medinipur-(2nd-Call).>2025-09-04
India Construction And Maintenance Of Road From L044-panchyat Ghar Thandi Kassi To Chapper Dhara (link Road), Package No. Jk12-4016, Pmgsy-iv, Batch-i Of 2025-26, Block-panjgrian, District Rajouri. (using Waste Plastic) Length-4.000 Kms 2025-09-04
India Absorption Strip For Flooring, L=2000mm .#* Absorption Strip For Flooring, L=2000mm, As Per Drawing: Lw41101 Alt D, Packi ng Instruction: Brown Papper Wrapping For Individual Item Collectively Packed In Jute Bags [ Warranty Period: 30 Months After The Dat 2025-09-04
-Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Barttan-Water-Supply-Scheme-Block--Bhagawanpur-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>India -Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Barttan-Water-Supply-Scheme-Block--Bhagawanpur-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>Wbphe/ee/mmd/niet- 12 Of 2025-26
Day To Day Operation And Guarding Of Pumping Machinery And Others At Pump House No. Tw-i, Ii Of Barttan Water Supply Scheme Block- Bhagawanpur-i Dist.- Purba Medinipur Under Midnapore Mechanical Division, P.h.e. Dte.
-Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i,-Ii-Of-Barttan-Water-Supply-Scheme-Block--Bhagawanpur-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>2025-09-04
-Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i-Of-Chingur-Dania-Water-Supply-Scheme-Block--Khejuri-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>India -Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i-Of-Chingur-Dania-Water-Supply-Scheme-Block--Khejuri-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>Wbphe/ee/mmd/niet- 12 Of 2025-26
Day To Day Operation And Guarding Of Pumping Machinery And Others At Pump House No. Tw-i Of Chingur Dania Water Supply Scheme Block- Khejuri-i Dist.- Purba Medinipur Under Midnapore Mechanical Division, P.h.e. Dte.
-Day-To-Day-Operation-And-Guarding-Of-Pumping-Machinery-And-Others-At-Pump-House-No.-Tw-i-Of-Chingur-Dania-Water-Supply-Scheme-Block--Khejuri-i-Dist.--Purba-Medinipur-Under-Midnapore-Mechanical-Division,-P.h.e.-Dte.>2025-09-04
India Supply & Installation Of Heavy Duty Long Span Storage System. .#* Supply & Installation Of Heavy Duty Long Span Storage System. [ Warranty Period: 30 Mon hs After The Date Of Delivery ] ] 2025-09-04
-Ce/eap/arrbp/ocb/bridge1/golaghat/11-Construction-Of-Bridge-In-Golaghat-District-R.c.c-Bridge-No-2/5-Of-Gelabil-Namiri-Gaon-Road>India -Ce/eap/arrbp/ocb/bridge1/golaghat/11-Construction-Of-Bridge-In-Golaghat-District-R.c.c-Bridge-No-2/5-Of-Gelabil-Namiri-Gaon-Road>Construction Of Bridge In Golaghat District R.c.c Bridge No 2/5 Of Gelabil Namiri Gaon Road Golaghat/11
Ce/eap/arrbp/ocb/bridge1/golaghat/11 Construction Of Bridge In Golaghat District R.c.c Bridge No 2/5 Of Gelabil Namiri Gaon Road
-Ce/eap/arrbp/ocb/bridge1/golaghat/11-Construction-Of-Bridge-In-Golaghat-District-R.c.c-Bridge-No-2/5-Of-Gelabil-Namiri-Gaon-Road>2025-09-04
Whats app