Filter Search


Asia-Pacific


Location Summary Deadline
India Supply Of 13520 Qtls. (approximately) Poultry Feed (crumbs) Of Different Types On For Basis Anywhere In H.p. 2024-10-25
India Construction Of Road From Dhalina Pond To Kedua Choto Masjid At Kedua Village Under Bahutali Gp, P.s- Suti I In The District Of Murshidabad (length Of The Road 3.570 Km). 2024-10-25
India Selection Of Solar Developer For Setting Up Of 05mw Grid Connected Solar Pv Power Project In District Mau. 2024-10-25
-Renovation-Of-Road-And-Drain-At-T-N-Banerjee-Road-Bye-Lane-And-Thakur-Nitya-Gopal-Road-Bye-Lane-Near-Kaiballya-Math-In-Ward-No.-03>India -Renovation-Of-Road-And-Drain-At-T-N-Banerjee-Road-Bye-Lane-And-Thakur-Nitya-Gopal-Road-Bye-Lane-Near-Kaiballya-Math-In-Ward-No.-03>Pm/pwd/nit-6/2024-25 Sl-12
Renovation Of Road And Drain At T N Banerjee Road Bye Lane And Thakur Nitya Gopal Road Bye Lane Near Kaiballya Math In Ward No. 03
-Renovation-Of-Road-And-Drain-At-T-N-Banerjee-Road-Bye-Lane-And-Thakur-Nitya-Gopal-Road-Bye-Lane-Near-Kaiballya-Math-In-Ward-No.-03>2024-10-25
New Zealand Rfi Regarding The Further Delivery Of Communication Assistance Services 2024-10-25
India Construction Of Hostel Building (g Plus 4) At Minority Welfare Department-morarji Desai Residential School, Bettadapura(anivalu) Village, Piriyapatana Taluk, Mysuru District 2024-10-25
India Arrear Payment For 306 Days In Connection With Revision Of Daily Rate Of Wages In Respect Of Contractors Labour Engaged As Pump Operator Working In Different Pwss Under Suti I, Ii, Lalgola And Others Block Under Medb Phe Dte.dte. 2024-10-25
India Design, Develop, Implement And Maintain Integration Of Data Caaqms/cems/eqms From Various Polluting Industries. 2024-10-25
-Non-Reactive-Fast-Dispersing-Resolvent-Compound-For-Heavy-Electrical-Circuits-And-Components-In-400-Ml-Units-As-Per-Annexure.-Make-Svp,-S--Tech,-Ichem,-Prolific,-Black-Lotus-Only.-Sample-To-Be-Approve>India -Non-Reactive-Fast-Dispersing-Resolvent-Compound-For-Heavy-Electrical-Circuits-And-Components-In-400-Ml-Units-As-Per-Annexure.-Make-Svp,-S--Tech,-Ichem,-Prolific,-Black-Lotus-Only.-Sample-To-Be-Approve>Supply Of Non Reactive Fast Dispersing Resolvent
Non Reactive Fast Dispersing Resolvent Compound For Heavy Electrical Circuits And Components In 400 Ml Units As Per Annexure. Make Svp, S- Tech, Ichem, Prolific, Black Lotus Only. Sample To Be Approve
-Non-Reactive-Fast-Dispersing-Resolvent-Compound-For-Heavy-Electrical-Circuits-And-Components-In-400-Ml-Units-As-Per-Annexure.-Make-Svp,-S--Tech,-Ichem,-Prolific,-Black-Lotus-Only.-Sample-To-Be-Approve>2024-10-25
-Three-Months-Trial-Run-For-Secondary-Grid-D.i-Pipe-Lines-Of-Different-Diameters-Of-Mandirbazar-Block-Within-Mega-Surface-Water-Based-Water-Supply-Scheme-Of-Falta-mathurapur-District-South-24-Pgns.-Under-South-24-Pgns-Water-Supply-Division-i,-Ph>India -Three-Months-Trial-Run-For-Secondary-Grid-D.i-Pipe-Lines-Of-Different-Diameters-Of-Mandirbazar-Block-Within-Mega-Surface-Water-Based-Water-Supply-Scheme-Of-Falta-mathurapur-District-South-24-Pgns.-Under-South-24-Pgns-Water-Supply-Division-i,-Ph>26/9
Three Months Trial Run For Secondary Grid D.i Pipe Lines Of Different Diameters Of Mandirbazar Block Within Mega Surface Water Based Water Supply Scheme Of Falta-mathurapur District South 24 Pgns. Under South 24 Pgns Water Supply Division-i, Ph
-Three-Months-Trial-Run-For-Secondary-Grid-D.i-Pipe-Lines-Of-Different-Diameters-Of-Mandirbazar-Block-Within-Mega-Surface-Water-Based-Water-Supply-Scheme-Of-Falta-mathurapur-District-South-24-Pgns.-Under-South-24-Pgns-Water-Supply-Division-i,-Ph>2024-10-25
Whats app