Filter Search


Asia-Pacific


Location Summary Deadline
Japan Advertisement For Income Tax Return 2024 On The Internet 1 Set 2024-11-25
Japan Next-generation Integrated Personnel System Construction Support (2nd Phase) Complete Set 2024-11-25
-Construction-Of-High-Lift-Pump-House-Of-Departmental-Design-And-Drawing-In-Connection-With-Jal-Jeevan-Mission-(jjm)for-Augmentation-Of-Kotalpukur-(zone--B)-Under-Bankura-->India -Construction-Of-High-Lift-Pump-House-Of-Departmental-Design-And-Drawing-In-Connection-With-Jal-Jeevan-Mission-(jjm)for-Augmentation-Of-Kotalpukur-(zone--B)-Under-Bankura-->Niet No - 21 Of The Fy 2024-2025 Of The Ee/bqa, Phe Dte. (2nd Call)(sl.no-10)
Construction Of High Lift Pump House Of Departmental Design And Drawing In Connection With Jal Jeevan Mission (jjm)for Augmentation Of Kotalpukur (zone- B) Under Bankura -
-Construction-Of-High-Lift-Pump-House-Of-Departmental-Design-And-Drawing-In-Connection-With-Jal-Jeevan-Mission-(jjm)for-Augmentation-Of-Kotalpukur-(zone--B)-Under-Bankura-->2024-11-25
Japan Jfy2024~2029 Development And Maintenance Of Web And Cloud Systems For Data Dissemination Of Earth Observation Satellites (g-portal V3 Web And Cloud) (1 Set) 2024-11-25
-Hexagon-Head-Bolt-M-16x35.-Specn.-Is:-1364(part-1)-2002-6.8.-Cadmium-Plated-Andpassivated-As-Per-Is:-1572-1986-Classification-Cd-8-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-)>India -Hexagon-Head-Bolt-M-16x35.-Specn.-Is:-1364(part-1)-2002-6.8.-Cadmium-Plated-Andpassivated-As-Per-Is:-1572-1986-Classification-Cd-8-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-)>Supply Of Hexagon Head Bolt M 16x35
Hexagon Head Bolt M 16x35. Specn. Is: 1364(part-1)-2002-6.8. Cadmium Plated Andpassivated As Per Is: 1572 1986 Classification Cd 8 [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-)
-Hexagon-Head-Bolt-M-16x35.-Specn.-Is:-1364(part-1)-2002-6.8.-Cadmium-Plated-Andpassivated-As-Per-Is:-1572-1986-Classification-Cd-8-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-)>2024-11-25
Japan Build One Large Survey Vessel 2024-11-25
Japan "fy2024 East Nippon Expressway Company, Ltd. System Audit" 2024-11-25
-Extruded-Z---Moulding-Drawing-No.:-cc-43354,-Alt.-(a)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Valu>India -Extruded-Z---Moulding-Drawing-No.:-cc-43354,-Alt.-(a)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Valu>Supply Of Extruded Z - Moulding Drawing No.:-cc 43354, Alt. (a)
Extruded Z - Moulding Drawing No.:-cc 43354, Alt. (a) [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Valu
-Extruded-Z---Moulding-Drawing-No.:-cc-43354,-Alt.-(a)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Valu>2024-11-25
Japan Information Network Security Infrastructure Development Usb Security Measures Complete Set 2024-11-25
Thailand Construction And Improvement Of Distribution System In The Area Of ??ban Non Makham Pom To Wat Phra Woraratchathinatdamat (point 2), Nong Yang Thoi Subdistrict, Si Thep District, Phetchabun Province 2024-11-25
Whats app