Filter Search


Asia-Pacific


Location Summary Deadline
India Tender Invited For Pm591-eth-ac500, Prog. Logic Controller, Part No. - 1sap150100r0271 , Ax522, Analog Input-output Modul,8ai,8ao, Part No. - 1sap250000r0001 , Cm574- Rs, Communication Module,2 Serial, Part No. - 1sap170400r0201 , Ao523, Analog Output Mod 2025-07-22
Japan Sluiceway Technical Cooperation Service, The Kojima Bay Coast Agricultural Land Disaster Prevention Project 2025-07-22
Philippines Ocm-25-pcp1-0690 Blanket And Others 2025-07-22
India Supply Of Earth Tester ...etc .#* Supply Of Earth Tester (analog 4 Terminal) Range 0-10-100 Ohms Double With Accessories. [ warranty Period: 30 Months After The Date Of Delivery ] ] 2025-07-22
India Provision Of External Electrification And Allied Works For Otm Accommodation At Leh. 2025-07-22
India Supply, Erection, Testing And Commission .#* Supply, Erection, Testing And Commissioning Of Microprocessor Test Bech For Reverser/ctf As Per Specifi cation Attached In Annexure-a And As Per Testing Report Format Attached In Annexure-b. Compliance Shall Be 2025-07-22
India Sale Of Property By The Cosmos Co-op. Bank Ltd, Mumbai V/s. Mrs. Sumitra Shankar Maddal 2025-07-22
India Telibandha Expressway Double Face102x10 Sq Feet Gaurav Path Anand Nagar Turn Double Face 100x10 Sq Feet In Front Of Pandri Bus Stand Double Face75x10 Sq Feet. 2025-07-22
-Electric-Wiring.-Supply,-Installation-Of-All-Materials-Reqd-For-Wiring-As-Per-Sow,-Supply,-Installation-Of-A.c.machine-With-Reqd-Copper-Pipe-Etc-Complete,-Acdb-With-Reqd-Power-Cable,-Light,-Fan-Etc.complete-At-Back>India -Electric-Wiring.-Supply,-Installation-Of-All-Materials-Reqd-For-Wiring-As-Per-Sow,-Supply,-Installation-Of-A.c.machine-With-Reqd-Copper-Pipe-Etc-Complete,-Acdb-With-Reqd-Power-Cable,-Light,-Fan-Etc.complete-At-Back>Ace/stz/backup Sldc/wiring/f-46/01
Electric Wiring. Supply, Installation Of All Materials Reqd For Wiring As Per Sow, Supply, Installation Of A.c.machine With Reqd Copper Pipe Etc Complete, Acdb With Reqd Power Cable, Light, Fan Etc.complete At Back
-Electric-Wiring.-Supply,-Installation-Of-All-Materials-Reqd-For-Wiring-As-Per-Sow,-Supply,-Installation-Of-A.c.machine-With-Reqd-Copper-Pipe-Etc-Complete,-Acdb-With-Reqd-Power-Cable,-Light,-Fan-Etc.complete-At-Back>2025-07-22
India Hex Head Screw .#* Hex Head Screw (ms) M12 X 25mm. Zinc Plated To Is:1364/2002 (pt-2). P.c.-8.8 [ Warr anty Period: 30 Months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: max 2025-07-22
Whats app