Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Temporary-Special-Latrine,-Temp.-Latrine-With-Commode-Facility-At-Diff.-Places-Of-G.s.-Mela-Ground-Including-Maintenance-Of-Latrine-In-C/with-Gs-Mela-2025-Under-Ksd-Of-Ad,-Phe-Dte.>India -Construction-Of-Temporary-Special-Latrine,-Temp.-Latrine-With-Commode-Facility-At-Diff.-Places-Of-G.s.-Mela-Ground-Including-Maintenance-Of-Latrine-In-C/with-Gs-Mela-2025-Under-Ksd-Of-Ad,-Phe-Dte.>Phed/ae/niet-02/ksd/2024-25_13
Construction Of Temporary Special Latrine, Temp. Latrine With Commode Facility At Diff. Places Of G.s. Mela Ground Including Maintenance Of Latrine In C/with Gs Mela-2025 Under Ksd Of Ad, Phe Dte.
-Construction-Of-Temporary-Special-Latrine,-Temp.-Latrine-With-Commode-Facility-At-Diff.-Places-Of-G.s.-Mela-Ground-Including-Maintenance-Of-Latrine-In-C/with-Gs-Mela-2025-Under-Ksd-Of-Ad,-Phe-Dte.>2024-10-30
-Additional-Work-For-Hatta-Piped-Water-Supply-Scheme-Under-Block-Darjeeling-Pulbazar-District-Darjeeling>India -Additional-Work-For-Hatta-Piped-Water-Supply-Scheme-Under-Block-Darjeeling-Pulbazar-District-Darjeeling>Et/10/se/gta Circle /phe Dte.of 2024-25 (sl. No. 24)
Additional Work For Hatta Piped Water Supply Scheme Under Block Darjeeling Pulbazar District Darjeeling
-Additional-Work-For-Hatta-Piped-Water-Supply-Scheme-Under-Block-Darjeeling-Pulbazar-District-Darjeeling>2024-10-30
-Bull-Gear-58-Teeth-For-Wap-4-Loco-As-Per-Clw's-Drg.-No.-03/1/11/45-(alt-5)-And-Rdso's-Spec.-No.-mp.0.2800.09-(rev.-02)-Of-June-2005.-[-Warranty-Period:-72-Months-After-The-Date-Of-Delivery-]-]>India -Bull-Gear-58-Teeth-For-Wap-4-Loco-As-Per-Clw's-Drg.-No.-03/1/11/45-(alt-5)-And-Rdso's-Spec.-No.-mp.0.2800.09-(rev.-02)-Of-June-2005.-[-Warranty-Period:-72-Months-After-The-Date-Of-Delivery-]-]>Supply Of Bull Gear 58 Teeth For Wap-4 Loco
Bull Gear 58 Teeth For Wap-4 Loco As Per Clw's Drg. No.-03/1/11/45 (alt-5) And Rdso's Spec. No.-mp.0.2800.09 (rev.-02) Of June 2005. [ Warranty Period: 72 Months After The Date Of Delivery ] ]
-Bull-Gear-58-Teeth-For-Wap-4-Loco-As-Per-Clw's-Drg.-No.-03/1/11/45-(alt-5)-And-Rdso's-Spec.-No.-mp.0.2800.09-(rev.-02)-Of-June-2005.-[-Warranty-Period:-72-Months-After-The-Date-Of-Delivery-]-]>2024-10-30
India Re-tender Minor Civil And Electric Work (conservation And Ancient Monument) Chapel Of St. Cajetan At Old Goa (painting Work). 2024-10-30
India Construction Of Boundary Wall, Toilet And Fixing Of Paver Block In Kachloha Ward 19 Maihar 2024-10-30
-Installing-A-Motor-Pump-And-Connecting-Pipeline-To-An-Existing-Well-At-Govt-Girls-Hs-School-Purulia>India -Installing-A-Motor-Pump-And-Connecting-Pipeline-To-An-Existing-Well-At-Govt-Girls-Hs-School-Purulia>Wbpwd/ss/ee/pur/nit-09/2024-25
Installing A Motor Pump And Connecting Pipeline To An Existing Well At Govt Girls Hs School Purulia
-Installing-A-Motor-Pump-And-Connecting-Pipeline-To-An-Existing-Well-At-Govt-Girls-Hs-School-Purulia>2024-10-30
-Uplifting-Of-Road-And-Repairing-Of-Drain-At-Nandan-Kanan-From-H/o-Shambhu-Das-To-H/o-Manoj-Dey.>India -Uplifting-Of-Road-And-Repairing-Of-Drain-At-Nandan-Kanan-From-H/o-Shambhu-Das-To-H/o-Manoj-Dey.>Pm/pwd/nit-10/2024-25 Sl-7
Uplifting Of Road And Repairing Of Drain At Nandan Kanan From H/o Shambhu Das To H/o Manoj Dey.
-Uplifting-Of-Road-And-Repairing-Of-Drain-At-Nandan-Kanan-From-H/o-Shambhu-Das-To-H/o-Manoj-Dey.>2024-10-30
-Additional-Work-For-Pws-Scheme-At-Ambootia-Tea-Garden-With-Fhtc-Under-Kurseong-Sub-Division,-Phed,-Gta.>India -Additional-Work-For-Pws-Scheme-At-Ambootia-Tea-Garden-With-Fhtc-Under-Kurseong-Sub-Division,-Phed,-Gta.>Et/10/se/gta Circle /phe Dte.of 2024-25 (sl. No. 65)
Additional Work For Pws Scheme At Ambootia Tea Garden With Fhtc Under Kurseong Sub Division, Phed, Gta.
-Additional-Work-For-Pws-Scheme-At-Ambootia-Tea-Garden-With-Fhtc-Under-Kurseong-Sub-Division,-Phed,-Gta.>2024-10-30
-Work-Rest-Roller-Assembly-For-Cnc-Station-2,-As-Per-Rwf-Drg-No.-725400210770.-1.-Warranty:-Warranty-Of-12-Months-From-The-Date-Of-Delivery-Or-9-Months-From-The-Date-Of-Fitmentor-Use-Whichever-Is-Early-Has-To-Be-Pr>India -Work-Rest-Roller-Assembly-For-Cnc-Station-2,-As-Per-Rwf-Drg-No.-725400210770.-1.-Warranty:-Warranty-Of-12-Months-From-The-Date-Of-Delivery-Or-9-Months-From-The-Date-Of-Fitmentor-Use-Whichever-Is-Early-Has-To-Be-Pr>Supply Of Work Rest Roller Assembly
Work Rest Roller Assembly For Cnc Station 2, As Per Rwf Drg No. 725400210770. 1. Warranty: Warranty Of 12 Months From The Date Of Delivery Or 9 Months From The Date Of Fitmentor Use Whichever Is Early Has To Be Pr
-Work-Rest-Roller-Assembly-For-Cnc-Station-2,-As-Per-Rwf-Drg-No.-725400210770.-1.-Warranty:-Warranty-Of-12-Months-From-The-Date-Of-Delivery-Or-9-Months-From-The-Date-Of-Fitmentor-Use-Whichever-Is-Early-Has-To-Be-Pr>2024-10-30
qty:3490
>India
qty:3490
>Supply Of Per Day Basis 20000 Ltrs Per Day, Per Day Basis 10 Hrs Or 20000 Ltrs Per Day, Per Day Basis 80 Km Or 20000 Ltrs Per Day, Per Day Basis 80 Km Or 20000 Ltrs Per Day In Haa, Per Day Basis 80 Km Or 20000 Ltrs Per Day In Shaa
qty:3490
qty:3490
>2024-10-30
Whats app