Filter Search


Asia-Pacific


Location Summary Deadline
Russian Federation Electric Actuator Auma Saexc 14.5/amexc 01.1, Butt Weld Flange 3-800-16 St09g2s, Flat Weld Flange 2-600-16 St09g2s, Coil Ds.302631.006 300x16 09g2s Fl.cr, F... 2025-06-03
Philippines Rehabilitation Of Sinsayon-cabulay Farm To Market Road 2025-06-03
-Sinking-Of-1-No.-Replacement-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-At-Champadanga-Mouza-Of-Baligari-Pwss>India -Sinking-Of-1-No.-Replacement-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-At-Champadanga-Mouza-Of-Baligari-Pwss>Wbphe/ee/11/hug/2025-26, Sl-11
Sinking Of 1 No. Replacement Tube-well, Rising Main For Inter Connection Between T.w And Distribution, At Champadanga Mouza Of Baligari Pwss
-Sinking-Of-1-No.-Replacement-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-At-Champadanga-Mouza-Of-Baligari-Pwss>2025-06-03
-Sinking-Of1-No.-Additional-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-Construction-Of-Switch-room-And-Boundary-Wall-Of-Astara-Pwss>India -Sinking-Of1-No.-Additional-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-Construction-Of-Switch-room-And-Boundary-Wall-Of-Astara-Pwss>Wbphe/ee/11/hug/2025-26, Sl-16
Sinking Of1 No. Additional Tube-well, Rising Main For Inter Connection Between T.w And Distribution, Construction Of Switch-room And Boundary Wall Of Astara Pwss
-Sinking-Of1-No.-Additional-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-Construction-Of-Switch-room-And-Boundary-Wall-Of-Astara-Pwss>2025-06-03
-Hand-Wheel-To-Drg.-No.-Wd-09057-s-01,-Alt-3,-Item-1,-Matl.-&-Spec.-As-Per-Drg.[quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:max-8-Lacs-]-]>India -Hand-Wheel-To-Drg.-No.-Wd-09057-s-01,-Alt-3,-Item-1,-Matl.-&-Spec.-As-Per-Drg.[quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:max-8-Lacs-]-]>Supply Of Hand Wheel.
Hand Wheel To Drg. No. Wd-09057-s-01, Alt-3, Item-1, Matl. & Spec. As Per Drg.[quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted:max 8 Lacs ] ]
-Hand-Wheel-To-Drg.-No.-Wd-09057-s-01,-Alt-3,-Item-1,-Matl.-&-Spec.-As-Per-Drg.[quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Value-Variation-Permitted:max-8-Lacs-]-]>2025-06-03
India Supply Of Set Of Node Assemblies For Ccb 2.0 Brake System Of Hhp 1.control Node Assy,ebv,terminated Similar To Kbi Partno.789589,qty- 01no./set 2.control Nodeassy,epcu,ft5000to Similar To Kbi Part No. 789992,qty- 01no./set 3.control Node Assy,20cp,similar 2025-06-03
Thailand Construction Of Expansion Area - Improvement Of Electrical Distribution System, Wat Phan Thong, Work Number (wbs) C-67-h-pntcs.h229 2025-06-03
-Sinking-Of-2-Nos.-Additional-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-Construction-Of-2-Nos.-Switch-room-And-Boundary-Wall-At-Dwipa-Pwss>India -Sinking-Of-2-Nos.-Additional-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-Construction-Of-2-Nos.-Switch-room-And-Boundary-Wall-At-Dwipa-Pwss>Wbphe/ee/11/hug/2025-26, Sl-2
Sinking Of 2 Nos. Additional Tube-well, Rising Main For Inter Connection Between T.w And Distribution, Construction Of 2 Nos. Switch-room And Boundary Wall At Dwipa Pwss
-Sinking-Of-2-Nos.-Additional-Tube-well,-Rising-Main-For-Inter-Connection-Between-T.w-And-Distribution,-Construction-Of-2-Nos.-Switch-room-And-Boundary-Wall-At-Dwipa-Pwss>2025-06-03
-Set-Of-Stop-For-Wag-9/wag-7-Loco-As-Per-Clw-Specification-No-Clw/ms/3/010,-With-Latest-Alt.-Consist-Of-02-Items,-07-Nos-Per-Set-(1)-Lateral-Stop-As-Per-Clw-Drg.-No.-1209.01.315.021,-Alt.-1-Or-Latest-(abb-Drg-No.>India -Set-Of-Stop-For-Wag-9/wag-7-Loco-As-Per-Clw-Specification-No-Clw/ms/3/010,-With-Latest-Alt.-Consist-Of-02-Items,-07-Nos-Per-Set-(1)-Lateral-Stop-As-Per-Clw-Drg.-No.-1209.01.315.021,-Alt.-1-Or-Latest-(abb-Drg-No.>Supply Of Set Of Stop For Wag-9 Loco
Set Of Stop For Wag-9/wag-7 Loco As Per Clw Specification No Clw/ms/3/010, With Latest Alt. Consist Of 02 Items, 07 Nos Per Set (1) Lateral Stop As Per Clw Drg. No. 1209.01.315.021, Alt. 1 Or Latest (abb Drg No.
-Set-Of-Stop-For-Wag-9/wag-7-Loco-As-Per-Clw-Specification-No-Clw/ms/3/010,-With-Latest-Alt.-Consist-Of-02-Items,-07-Nos-Per-Set-(1)-Lateral-Stop-As-Per-Clw-Drg.-No.-1209.01.315.021,-Alt.-1-Or-Latest-(abb-Drg-No.>2025-06-03
India Rfq-2025 For The Maintenance Works To Be Taken Up On Risk And Cost Of The Concessionaire / Contractor Under Ro-kolkata 2025-06-03
Whats app