Filter Search


Asia-Pacific


Location Summary Deadline
-Road-Repairing-With-Rbm-From-The-House-Of-Dipchan-Roy-To-The-House-Of-Sunil-Roy-At-Chapatali,-Part-No-12/109-In-Banchukamari-Gp-Within-Alipurduar-i-Development-Block>India -Road-Repairing-With-Rbm-From-The-House-Of-Dipchan-Roy-To-The-House-Of-Sunil-Roy-At-Chapatali,-Part-No-12/109-In-Banchukamari-Gp-Within-Alipurduar-i-Development-Block>Wb/apd-i/bdo-et/12/2025-26
Road Repairing With Rbm From The House Of Dipchan Roy To The House Of Sunil Roy At Chapatali, Part No 12/109 In Banchukamari Gp Within Alipurduar-i Development Block
-Road-Repairing-With-Rbm-From-The-House-Of-Dipchan-Roy-To-The-House-Of-Sunil-Roy-At-Chapatali,-Part-No-12/109-In-Banchukamari-Gp-Within-Alipurduar-i-Development-Block>2026-01-01
India Tender Invited For Calibration Services - Mechanical, Electrical, Fluid Flow; Pressure And Vacuum, Voltage, Current, Power (ac/dc), Mass And Volume, Force; Nabl Labs; Buyer Premises (onsite)##quantity: 1## 2026-01-01
India Shifting Of Drain Line At Sphere No 5,6,7,8 Oil/gas/lubricants 2026-01-01
India Installation Of Solar Light Near Tukli Mandal House Mouza Gurnagar Jl No 87 Ps No81 Of Pakuahat Gram Panchayat Under Bamangola Dev Block 2026-01-01
India Tender Invited For Handling ,transport And Other Mining Services - Percentage Quote Based - Handling & Transport Service##quantity: 1## 2026-01-01
India Mechanical Wheel Diameter Gauge .#* Mechanical Wheel Diameter Gauge (folding Type) For Measurement Of Wheel Mea suring Range= 800 To 1030 Mm, M-type, Least Count:0.1 Mm For B.g. Coaches & Wagons Along with Calibration Certificate From Nabl Lab Having Vali 2026-01-01
-Electrical-Installation-Works-For-New-Construction-Of-Barachandghar-Dakshinpara-Sub-Health-Centre-(hwc)-Under-Kaliganj-Block.>India -Electrical-Installation-Works-For-New-Construction-Of-Barachandghar-Dakshinpara-Sub-Health-Centre-(hwc)-Under-Kaliganj-Block.>Cmoh-nad/06 Of 2025-26/1
Electrical Installation Works For New Construction Of Barachandghar Dakshinpara Sub Health Centre (hwc) Under Kaliganj Block.
-Electrical-Installation-Works-For-New-Construction-Of-Barachandghar-Dakshinpara-Sub-Health-Centre-(hwc)-Under-Kaliganj-Block.>2026-01-01
India Construction Of Concrete High Drain With Coverd At Kolorah Jairul Laskar House To Jojlu Rahaman Mondal House Apas/01/174/78/0003 2026-01-01
India Various Electric Items 2026-01-01
-Supply-And-Installation-Of-Passive-Fire-Protection-System-For-Cables-At-Substations-Of-Mainplant.>India -Supply-And-Installation-Of-Passive-Fire-Protection-System-For-Cables-At-Substations-Of-Mainplant.>Supply And Installation Of Passive Fire Protection System For Cables At Substations Of Mainplant.
Supply And Installation Of Passive Fire Protection System For Cables At Substations Of Mainplant.
-Supply-And-Installation-Of-Passive-Fire-Protection-System-For-Cables-At-Substations-Of-Mainplant.>2026-01-01
Whats app