Filter Search


Asia-Pacific


Location Summary Deadline
India (pmgsy 2024-25) Resurfacing And Strengthening Of Various Road In Godhra Taluka Pkg. No. 2024-25/36 2025-09-03
India Poh Kit (54 Months) For Elgi Air Compressor ,model-rr15070, Elgi Part No -072420309 Fitted At 1600hp Demu Dpc(consisting Of 69 Items/set As Per annexure-a) Make-elgi .#* Poh Kit (54 Months) For Elgi Air Compressor ,model-rr15070, Elgi Part No -072420 309 2025-09-03
India Swing Door Frame .#* Swing Door Frame With Panel [lh] To Rdso Drg. No. Wd-90030-s-66, Alt. 10, Item No. 01 Alo ng With Items- 1a 4,5,6, 7, 8, 8a,9,11 & 13 In Assembled Condition. [ Warranty Period: 30 Months After The D ate Of Delivery ] [quantity Toleran 2025-09-03
-Appointme>India -Appointme>Appointment Of Safety Consultant For Improvement To Four Lane With Paved Shoulders Configuration From Existing Km 0.000 To Km 39.500 Design Length 40.842 Km) Of Nh-227a (near Mehrauna Ghat To Siwan) Of Ram Janki Marg In Bihar On Ham Basis.
Appointme
-Appointme>2025-09-03
India L-alanyl-l-glutamine 20 Gm Injection 100 Ml .#* L-alanyl-l-glutamine 20 Gm Injection 100 Ml [ Warranty Period: 30 Months After the Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitt ed: Max 8 L 2025-09-03
India Auction Sale Of Lot No - 01 Lot Name - Sale Of Fly Ash From Ash Silos Of Unit No. 7 & 8 Product Type - Ash Category - Fly Ash 2025-09-03
-Procurement-Of-7/3.66-Mm-Galvanised-Steel-Stranded-Earth-Wire-Of-1100-N-/-Mm-Sq-Quality(83.24-Km)>India -Procurement-Of-7/3.66-Mm-Galvanised-Steel-Stranded-Earth-Wire-Of-1100-N-/-Mm-Sq-Quality(83.24-Km)>Procurement Of 7/3.66 Mm Galvanised Steel Stranded Earth Wire Of 1100 N / Mm Sq Quality(83.24 Km) Bn-9018002518
Procurement Of 7/3.66 Mm Galvanised Steel Stranded Earth Wire Of 1100 N / Mm Sq Quality(83.24 Km)
-Procurement-Of-7/3.66-Mm-Galvanised-Steel-Stranded-Earth-Wire-Of-1100-N-/-Mm-Sq-Quality(83.24-Km)>2025-09-03
India Amrit Bharat Furniture For Shridham Rly Station .#* Steel Benches,3 Seater [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-03
India Tender Invited For Skid Mounted Hydraulic Power Unit For Iron Rough Neck##quantity: 1## 2025-09-03
India Alleppey (allp) P.way Section (zone-tr-12) - Execution Of Works And Supply Of materials For Track Maintenance For The Year 2025-26 2025-09-03
Whats app