Filter Search


Asia-Pacific


Location Summary Deadline
India Drinking Water Facility Work At Gps Ghatiya Bahi Block- Phalasiya District- Udaipur 2024-10-23
India Drinking Water Facility At Gps Banjara Basti (nim) Block Chhabra 2024-10-23
India Supply Of Animal Food Items Of Required Specification At The Kamla Nehru Prani Sangrahalaya (zoo), Indore Chicken And Eggs 2024-10-23
-Supply-Of-Misc.-Items-For-Maintenance-Of-Different-Rli-Schemes-Under-Khanakul-(a-m)sub-division-Under-Chinsurah-(a-m)-Division-Under-Non-plan-Programme>India -Supply-Of-Misc.-Items-For-Maintenance-Of-Different-Rli-Schemes-Under-Khanakul-(a-m)sub-division-Under-Chinsurah-(a-m)-Division-Under-Non-plan-Programme>Supply Of Misc. Items For
Supply Of Misc. Items For Maintenance Of Different Rli Schemes Under Khanakul (a-m)sub-division Under Chinsurah (a-m) Division Under Non-plan Programme
-Supply-Of-Misc.-Items-For-Maintenance-Of-Different-Rli-Schemes-Under-Khanakul-(a-m)sub-division-Under-Chinsurah-(a-m)-Division-Under-Non-plan-Programme>2024-10-23
Japan Improvement Of The Environment For Stable Provision Of Gnss Satellite Orbit Information, 1 Set 2024-10-23
-New-Construction-Of-3-Rooms-(opd-Room,-Drug-Store-&-Pharmacy-Room)at-C.h.c.>India -New-Construction-Of-3-Rooms-(opd-Room,-Drug-Store-&-Pharmacy-Room)at-C.h.c.>Building Work.
New Construction Of 3 Rooms (opd Room, Drug Store & Pharmacy Room)at C.h.c.
-New-Construction-Of-3-Rooms-(opd-Room,-Drug-Store-&-Pharmacy-Room)at-C.h.c.>2024-10-23
India Strengthening Of Existing School At G.u.p.s. Bhawani Kheda Block Ajmer Rural Distt Ajmer 2024-10-23
-Balance-Work-For-Construction-Of-Cement-Concrete-Road-Along-With-Drain-With-Cover-Slab-Gorai-Shop-To-Icds-Centre-At-Sardarpara-Jala-Via-Mintu-House-To-Mahesh-Dhara-Khal-Under-Bankra-iii-G.p.-Within-Domjur>India -Balance-Work-For-Construction-Of-Cement-Concrete-Road-Along-With-Drain-With-Cover-Slab-Gorai-Shop-To-Icds-Centre-At-Sardarpara-Jala-Via-Mintu-House-To-Mahesh-Dhara-Khal-Under-Bankra-iii-G.p.-Within-Domjur>34 Of 2024-25(1st Call) Sl. No.2 Dt-03.10.24
Balance Work For Construction Of Cement Concrete Road Along With Drain With Cover Slab Gorai Shop To Icds Centre At Sardarpara Jala Via Mintu House To Mahesh Dhara Khal Under Bankra-iii G.p. Within Domjur
-Balance-Work-For-Construction-Of-Cement-Concrete-Road-Along-With-Drain-With-Cover-Slab-Gorai-Shop-To-Icds-Centre-At-Sardarpara-Jala-Via-Mintu-House-To-Mahesh-Dhara-Khal-Under-Bankra-iii-G.p.-Within-Domjur>2024-10-23
-Renovation-Of-Surface-Drain-With-Passage-Works-At-Mithatalaw-Lane-N/h/no.--t-184,-T-124,-T-184-2-Etc-In-Ward-No.--138,-Br-xv.>India -Renovation-Of-Surface-Drain-With-Passage-Works-At-Mithatalaw-Lane-N/h/no.--t-184,-T-124,-T-184-2-Etc-In-Ward-No.--138,-Br-xv.>Kmc/dgc/xv/138/031/2024 -2025/r
Renovation Of Surface Drain With Passage Works At Mithatalaw Lane N/h/no. -t-184, T-124, T-184 2 Etc In Ward No. -138, Br-xv.
-Renovation-Of-Surface-Drain-With-Passage-Works-At-Mithatalaw-Lane-N/h/no.--t-184,-T-124,-T-184-2-Etc-In-Ward-No.--138,-Br-xv.>2024-10-23
-Set-Up-Captive-Ists--Connected,-Co-located-Wind-solar-Hybrid-Power-Projects-With-A-Capacity-Of-1,-000-Mw-(500-Mw-Solar-+-500-Mw-Wind)-Anywhere-Inindia,-With-Operation-And-Maintenance-(o&m)-For-Ten-Ye>India -Set-Up-Captive-Ists--Connected,-Co-located-Wind-solar-Hybrid-Power-Projects-With-A-Capacity-Of-1,-000-Mw-(500-Mw-Solar-+-500-Mw-Wind)-Anywhere-Inindia,-With-Operation-And-Maintenance-(o&m)-For-Ten-Ye>Tender For 1 Gw Wind-solar Hybrid Power Projects.
Set Up Captive Ists- Connected, Co-located Wind-solar Hybrid Power Projects With A Capacity Of 1, 000 Mw (500 Mw Solar + 500 Mw Wind) Anywhere Inindia, With Operation And Maintenance (o&m) For Ten Ye
-Set-Up-Captive-Ists--Connected,-Co-located-Wind-solar-Hybrid-Power-Projects-With-A-Capacity-Of-1,-000-Mw-(500-Mw-Solar-+-500-Mw-Wind)-Anywhere-Inindia,-With-Operation-And-Maintenance-(o&m)-For-Ten-Ye>2024-10-23
Whats app