Filter Search


Asia-Pacific


Location Summary Deadline
Thailand Building Expansion - Improve Electricity Distribution Systems Don Hua Lo Subdistrict Municipality Office work Number (wbs) C-67-h- Pntsr.g268 2025-08-06
Thailand Hire A Third Party, Installed 22 Kv Snack Card - City Industrial Estate Chon Buri Phase amount 10, 41 Trees - The Route In Front Of The Company Pathum Than Sportsom Tacity 25 Chonburi Branch (deteriorated) total 66 Trees 2025-08-06
India Public Tender For Perpetual Empanelment Of Contractors For Execution Of Various Types And Nature Of Engineering Works Under Maharashtra State Office Under Category-i 0-100 Lakhs And Category- Ii 100-200 Lakhs 2025-08-07
India Construction of Sos Mess With 45 Suites at Bsf Campus Dholchera Of 170 Bn. Bsf. 2025-08-07
India Supply, Installation, Testing, Commissioning And Training Of Electrical, Plumbing And Fire Protection Works For 19 Underground Stations From Madhavaram Milk Colony Station To Royapettah Govt Hospital Station Including Bored Tunnel Between Stations (ch. 76 2025-08-07
-Single-Core-Cable-4gkw-ax25,1800v,-Bk,-As-Per-Clw's-Specn.no.clw/es/3/0458/e-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>India -Single-Core-Cable-4gkw-ax25,1800v,-Bk,-As-Per-Clw's-Specn.no.clw/es/3/0458/e-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>Tender Invited For Single Core Cable 4gkw-ax25,1800v, Bk
Single Core Cable 4gkw-ax25,1800v, Bk, As Per Clw's Specn.no.clw/es/3/0458/e [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal
-Single-Core-Cable-4gkw-ax25,1800v,-Bk,-As-Per-Clw's-Specn.no.clw/es/3/0458/e-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal>2025-08-07
India C/o Sos Mess With 45 Suites 2025-08-07
Japan Renovation Of The House Of Representatives Office Telephone Switchboard Equipment 2025-08-07
Thailand Contract For Construction Labor Costs Only For The Expansion Of The Electricity Distribution System, Allocated To Palm Garden Chiang Mai Co., Ltd 2025-08-07
-Station-Including-Bored-Tunnel-Between-Stations-(>India -Station-Including-Bored-Tunnel-Between-Stations-(>Supply, Installation, Testing, Commissioning And Training Of Electrical, Plumbing And Fire Protection Works For 19 Underground Stations From Madhavaram Milk Colony Station To Royapettah Govt Hospital
Station Including Bored Tunnel Between Stations (
-Station-Including-Bored-Tunnel-Between-Stations-(>2025-08-07
Whats app