Filter Search


Asia-Pacific


Location Summary Deadline
India Brush Holders Assembly Lh & Rh Along With Insulating Rod For Traction Motor cgl Make, Model C1005 To Cgl Drg.no. Cgm206402 Item 1 & 2 Or Equivalent To rdso Spec.no. P.0.2100.09 Rev 3 Oct 14 For 1400hp Demu/dpc. 1 Set consisting Of 2 Nos Lh Brush Holder & 2025-09-01
India Stud (part Of Oil Pressure Relief Valve [stud (part Of Oil Pressure Relief Valve assembly) As Per Gd Part No. 2012821. .#* Stud (part Of Oil Pressure Relief Valve Assembly) As Per Gd Part No. 2012821. [ Warranty Pe riod: 30 Months After The Date Of Delive 2025-09-01
India Contactor St Emd Pt. No. 9325207 As Per Drg.no. Emd Pt No.9325207 specn: Dlw Pt No.18140026 .#* Contactor St Emd Pt. No. 9325207 As Per Drg.no. Emd Pt No.9325207 Specn: Dlw pt No.18140026 [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-01
India Movable Tender At Door Step .#* Movable Tender At Door Step, 30 Kg. Details As Per Annexure. [ Warranty Period: 30 months After The Date Of Delivery ] ] 2025-09-01
India Invited Tender For Large Catenary Suspension Bracket Part No. 2131 And 2132 Complete With Nut, Bolt & Washer As Per Rdso Drg. No. Eti/ohe/p/2130 Mod-b [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-09-01
India Stall No 15 Stall On Demand Newly Constructed Cbt Bus Stand Dharwad Built Stall Area 844.630 Sq.mtr. 2025-09-01
-New-Ht-Bulk-Connection-I.r.o-The-Partner-Yash-Jain-Of-Anjy-Estates-Llp-At-Shubharara-By-Laying-Of-11-Kv-Ug-Cable-With-185-Sq.-Mm-3c-Xlpe-450-Mtr.-Through-Micro-tunneling-And-60-Mtr.-In-The-Existing-Trench-Under-Uluberia-Divisio>India -New-Ht-Bulk-Connection-I.r.o-The-Partner-Yash-Jain-Of-Anjy-Estates-Llp-At-Shubharara-By-Laying-Of-11-Kv-Ug-Cable-With-185-Sq.-Mm-3c-Xlpe-450-Mtr.-Through-Micro-tunneling-And-60-Mtr.-In-The-Existing-Trench-Under-Uluberia-Divisio>Rm/hro/e/e-t/25-26/15
New Ht Bulk Connection I.r.o The Partner Yash Jain Of Anjy Estates Llp At Shubharara By Laying Of 11 Kv Ug Cable With 185 Sq. Mm 3c Xlpe 450 Mtr. Through Micro-tunneling And 60 Mtr. In The Existing Trench Under Uluberia Divisio
-New-Ht-Bulk-Connection-I.r.o-The-Partner-Yash-Jain-Of-Anjy-Estates-Llp-At-Shubharara-By-Laying-Of-11-Kv-Ug-Cable-With-185-Sq.-Mm-3c-Xlpe-450-Mtr.-Through-Micro-tunneling-And-60-Mtr.-In-The-Existing-Trench-Under-Uluberia-Divisio>2025-09-01
India Stall No 30 Stall On Demand Newly Constructed City & Sub Urban Bus Stand Hubli Open Space Area 11.09 Sqmtr 2025-09-01
India Repair And Maintenance Of Dg Sets,street Lights,security Lights,high Mast Lights And Other Connected Items At Air Force Station Barwala Under Age (i) Highground Chandigarh 2025-09-01
India Replacement Of Existing Fire Water Pipeline And Deluge Valve At Uluberia Lpg Plant 2025-09-01
Whats app