Filter Search


Asia-Pacific


Location Summary Deadline
India Supply Of Stainless Steel Hex Head Screw Full Thread, Size:m12x60, With 1) Stainless Steel Nyloc Nut, Size: M12 = 01 No, 2) Stainless Steel Flat Section Spring Washer Size: M12 = 01 Nos, 3) Stainless Steel Plain Washer, Size:m12= 02 Nos , All In Assembled 2026-01-02
India License For Snack-bar Facility In Sha At Agra Airport 2026-01-02
India Led Frequency Meter Size 96 Sq. Cm For Measuring Frequency Etc. .#* Led Frequency Meter Size 96 Sq. Cm For Measuring Frequency Suitable For Voltage 50-500v A c With Auxiliary Supply 24/110v Dc, 4va Class 0.2 Suitable For Switch Board Cabinet For Hog Compl 2026-01-02
India Engine For Rail Drilling Machine, Compressor, Blower & Double Action Weld Trimmer. .#* Engine For Rail Drilling Machine, Compressor, Blower & Double Action Weld Trimmer As Per Tech nical Specification Attached. [ Warranty Period: 12 Months After The Date 2026-01-02
India Arrangement Of Street Light At Mirza Galib Street And Soudagar Plot Ward 89 Booth 108 2026-01-02
India Csk Bolt With Nut & Spring Washer. .#* Csk Bolt With Nut & Spring Washer, Part No: M20x80 Mm, Material Specification :- All Csk Bo lts Are To Be Manufactured From High Grade Alloy Steel Confirming To Is: 6761 , Iso: 10642 ; Thread Iso Me tric 4g-6g As Per 2026-01-02
India Raising The Machinehole Bharath Nagar, Surya Nagar Main Road, Jawaharlalpuram, Lourthu Nagar East 4th 5th Street, Gandhipuram, Thesiga Vinayagar Street, Sankar Nagar 4th, 5th Street In Ward No.10, 12, 14 2026-01-02
-Construction-Of-Pcc-Road-From-Bablu-Purakait-House-To-Basar-House-Moynapota-Apas-Fy-2025-26>India -Construction-Of-Pcc-Road-From-Bablu-Purakait-House-To-Basar-House-Moynapota-Apas-Fy-2025-26>Nit_35_sl_13
Construction Of Pcc Road From Bablu Purakait House To Basar House Moynapota Apas Fy 2025-26
-Construction-Of-Pcc-Road-From-Bablu-Purakait-House-To-Basar-House-Moynapota-Apas-Fy-2025-26>2026-01-02
-Construction-Of-Cc-Road-From-The-H/o-Dwijen-Halder-Towards-H/o-Prafulla-Sikdar-At-Purba-Nowga-Sansad-About-100-Mts.-(scheme-Id-apas/01/041/173/0002)>India -Construction-Of-Cc-Road-From-The-H/o-Dwijen-Halder-Towards-H/o-Prafulla-Sikdar-At-Purba-Nowga-Sansad-About-100-Mts.-(scheme-Id-apas/01/041/173/0002)>760/apas/tps, Sl-15
Construction Of Cc Road From The H/o Dwijen Halder Towards H/o Prafulla Sikdar At Purba Nowga Sansad About 100 Mts. (scheme Id-apas/01/041/173/0002)
-Construction-Of-Cc-Road-From-The-H/o-Dwijen-Halder-Towards-H/o-Prafulla-Sikdar-At-Purba-Nowga-Sansad-About-100-Mts.-(scheme-Id-apas/01/041/173/0002)>2026-01-02
-Installation-Of-Mini-High-Mast-Sollar-Light-At-Suryanagar-Uttarpara-Kalimandir-Mouza-Mahisal-Jl-261.-Farmers-Field-About-90-Mtrs-10-Ft-And-10-Trolly>India -Installation-Of-Mini-High-Mast-Sollar-Light-At-Suryanagar-Uttarpara-Kalimandir-Mouza-Mahisal-Jl-261.-Farmers-Field-About-90-Mtrs-10-Ft-And-10-Trolly>Installation Of Mini High Mast Sollar Light At Suryanagar Uttarpara Kalimandir Mouza Mahisal Jl 261.
Installation Of Mini High Mast Sollar Light At Suryanagar Uttarpara Kalimandir Mouza Mahisal Jl 261. Farmers Field About 90 Mtrs 10 Ft And 10 Trolly
-Installation-Of-Mini-High-Mast-Sollar-Light-At-Suryanagar-Uttarpara-Kalimandir-Mouza-Mahisal-Jl-261.-Farmers-Field-About-90-Mtrs-10-Ft-And-10-Trolly>2026-01-02
Whats app