Filter Search


Asia-Pacific


Location Summary Deadline
-E---Loader-(battery-Operated)-Details-Mentioned-In-Annexure--i-,-Is-Attached-Here-With.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>India -E---Loader-(battery-Operated)-Details-Mentioned-In-Annexure--i-,-Is-Attached-Here-With.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>Supply Of Procurement Of E - Loader (battery Operated) Etc.
E - Loader (battery Operated) Details Mentioned In Annexure -i , Is Attached Here With. [ Warranty Period: 30 Months After The Date Of Delivery ] ]
-E---Loader-(battery-Operated)-Details-Mentioned-In-Annexure--i-,-Is-Attached-Here-With.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-]-]>2024-10-25
-Allied-Works-Corresponding-To-Providing-And-Installation-Of-Substation-Equipments-And-Other-Accessories-At-Ramnagar-Head-Works-Site-Under-Rcfa-Part-iii-(zone-ii)-Water-Supply-Scheme,-Block-Pandabeswar,-Dist.-Pasc>India -Allied-Works-Corresponding-To-Providing-And-Installation-Of-Substation-Equipments-And-Other-Accessories-At-Ramnagar-Head-Works-Site-Under-Rcfa-Part-iii-(zone-ii)-Water-Supply-Scheme,-Block-Pandabeswar,-Dist.-Pasc>Wbphed/ee/amd/niet-30 Of 2024-2025/2
Allied Works Corresponding To Providing And Installation Of Substation Equipments And Other Accessories At Ramnagar Head Works Site Under Rcfa Part-iii (zone-ii) Water Supply Scheme, Block Pandabeswar, Dist. Pasc
-Allied-Works-Corresponding-To-Providing-And-Installation-Of-Substation-Equipments-And-Other-Accessories-At-Ramnagar-Head-Works-Site-Under-Rcfa-Part-iii-(zone-ii)-Water-Supply-Scheme,-Block-Pandabeswar,-Dist.-Pasc>2024-10-25
India Item Supply Of Nilgiri Pole 2024-10-25
-Supply-And-Delivery-Of-Rotating-Assembly-Of-1.75-Mgh-Capacity-Heavy-Duty-Centrifugal-Pump-No.-3-At-Intake>India -Supply-And-Delivery-Of-Rotating-Assembly-Of-1.75-Mgh-Capacity-Heavy-Duty-Centrifugal-Pump-No.-3-At-Intake>Operation & Maintenance Of Plant Machineries Including Chlorination And Allied Services At Layalka Booster Pumping Station For 3 (three) Years.
Supply And Delivery Of Rotating Assembly Of 1.75 Mgh Capacity Heavy Duty Centrifugal Pump No.-3 At Intake
-Supply-And-Delivery-Of-Rotating-Assembly-Of-1.75-Mgh-Capacity-Heavy-Duty-Centrifugal-Pump-No.-3-At-Intake>2024-10-25
India Replacement Of Defective Power Correction Device At Maya Pump House No.-ii, Under Lalgola Block Under Medb, P.h.e. Dte. 2024-10-25
India Providing Of Monthly Basis Cab Taxi Hiring Services - Suv; 1500 Km X 260 Hours; Outstation 247 2024-10-25
India Providing Of Monthly Basis Cab Taxi Hiring Services - Sedan; 1760 Km X 220 Hours; Local 2024-10-25
Philippines Rehabilitation Of Flood Control System, Barangay Cabong, Borongan City, Eastern Samar 2024-10-25
qty:620
>India
qty:620
>Supply Of Target Paper Fig No 11, Fig 11 Combat Target Paper, Wooden Target Frame 4 Inch To 4 Inch, 4 Inch To 4 Inch Zeoring Target Paper, 4 Inch To 4 Inch Target Paper, S Bag
qty:620
qty:620
>2024-10-25
India Jalalpur Murlipur Link Road Se School Ke Peeche Hote Huye Bambi Tak Cc Karya 2024-10-25
Whats app