Filter Search


Asia-Pacific


Location Summary Deadline
-Deployment-And-Hiring-Charges-Of-A-Boat-Mounted-Dredging-Pump-Assembly-Including-Reconditioned-Diesel-Engine,-Overhauled-Slurry-Pump,-Timber-Based-Floating-Platform-With-Gl-Drum-Floatation,-Cl-Delivery-Pip>India -Deployment-And-Hiring-Charges-Of-A-Boat-Mounted-Dredging-Pump-Assembly-Including-Reconditioned-Diesel-Engine,-Overhauled-Slurry-Pump,-Timber-Based-Floating-Platform-With-Gl-Drum-Floatation,-Cl-Delivery-Pip>Phe/swsd/ee/niet- 18 Of 2025-26 (sl No 01 )
Deployment And Hiring Charges Of A Boat Mounted Dredging Pump Assembly Including Reconditioned Diesel Engine, Overhauled Slurry Pump, Timber Based Floating Platform With Gl Drum Floatation, Cl Delivery Pip
-Deployment-And-Hiring-Charges-Of-A-Boat-Mounted-Dredging-Pump-Assembly-Including-Reconditioned-Diesel-Engine,-Overhauled-Slurry-Pump,-Timber-Based-Floating-Platform-With-Gl-Drum-Floatation,-Cl-Delivery-Pip>2026-01-05
India Repairing Of Road Nandi House To Ananda Saha House 125ft Apas01140440006 2026-01-05
India Construction Of Brick Masonry Drain From Parameswar Patras House To Sanjay Garais House In Ward No.- 03 Under Jhargram Municipality Ward-03, Booth- 209 2026-01-05
China Purchase Of Color Ultrasound Diagnostic Instrument Imported By Xinjiang Uygur Autonomous Region Institute For The Prevention And Control Of Tuberculosis 2026-01-05
-Pvc-Pipe-Line-At-Chamri-Building,-Srmb-Building-And-Bc-Roy-Hostel-Building-And-Construction-Of-Sluice-Valve-Chamber-Of-Bankura-Sammilani-Medical-College-And-Hospitail-Water-Supply-S>India -Pvc-Pipe-Line-At-Chamri-Building,-Srmb-Building-And-Bc-Roy-Hostel-Building-And-Construction-Of-Sluice-Valve-Chamber-Of-Bankura-Sammilani-Medical-College-And-Hospitail-Water-Supply-S>Niet No. - 04 Of The Fy 2025-2026 Of The Ae/bsd, Phe Dte.(sl.no-06)
Pvc Pipe Line At Chamri Building, Srmb Building And Bc Roy Hostel Building And Construction Of Sluice Valve Chamber Of Bankura Sammilani Medical College And Hospitail Water Supply S
-Pvc-Pipe-Line-At-Chamri-Building,-Srmb-Building-And-Bc-Roy-Hostel-Building-And-Construction-Of-Sluice-Valve-Chamber-Of-Bankura-Sammilani-Medical-College-And-Hospitail-Water-Supply-S>2026-01-05
India Set Of Tube (finished) For Lhb Bogie .#* Set Of Tube (finished) For Lhb Bogie As Per Drawing: No. 1) Lw03304 Alt, Nil- 04 No s. 2) Lw03303 Alt. A - 08 Nos. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2026-01-05
India Construction Of Piling Work At Southern Side Of Dule Pukur Beside Of Road At Utrampur (booth No- 283) At Durgapur Gp Under Memari-i Ps , Fund- Apas 2026-01-05
India Construction Of Rbm Road From Paikarer Bari To Pagal Para. Part- 16/258 At Padamati-i Gp Under Maynaguri Development Block 2026-01-05
India Installation Of Solar Lights At Various Locations. Solar Light 2026-01-05
Malaysia Tender For Supply And Delivery Of Raw, Wet And Dry Materials Part I-iv At Temenggong Seri Maharaja Tun Ibrahim Hospital, Kulai For A Period Of Three 3 Years 2026-01-05
Whats app