Filter Search


Asia-Pacific


Location Summary Deadline
-Dedicated-Pipe-Line-For-Functionality,-Road-Restoration,-Rectification-Of-Fhtc-And-Installation-Of-Functional-House-Connection-Of-Mobarakpur-Piped-Water-Supply-Scheme-Under-Malda-Division-Phe.-Dte.>India -Dedicated-Pipe-Line-For-Functionality,-Road-Restoration,-Rectification-Of-Fhtc-And-Installation-Of-Functional-House-Connection-Of-Mobarakpur-Piped-Water-Supply-Scheme-Under-Malda-Division-Phe.-Dte.>Wbphed/ee/md/niet_15 Of 2025-2026, Sl.no.02
Dedicated Pipe Line For Functionality, Road Restoration, Rectification Of Fhtc And Installation Of Functional House Connection Of Mobarakpur Piped Water Supply Scheme Under Malda Division Phe. Dte.
-Dedicated-Pipe-Line-For-Functionality,-Road-Restoration,-Rectification-Of-Fhtc-And-Installation-Of-Functional-House-Connection-Of-Mobarakpur-Piped-Water-Supply-Scheme-Under-Malda-Division-Phe.-Dte.>2025-07-12
India Tender Invited For Manpower Outsourcing Services - Minimum Wage - Skilled; Secondary School; Admin , Manpower Outsourcing Services - Minimum Wage - Semi-skilled; High School; Others##quantity: 2## 2025-07-12
India Tender Invited For Led Luminaire For Floodlight (v2) Conforming To Is 10322 (part 5/section 5) (q3)##quantity: 75## 2025-07-12
India Repair/replacement Of Internal Wiring Incl Sub Main Wiring, Mcb Dbs, Bldg Security Lights And Connected Items In Pocket 7 And 8 Under Ge Roorkee 2025-07-12
India Tender Invited For Ph Meter (q3)##quantity: 1## 2025-07-12
India Supply Of Micronutrients- Zn-edta Zn 12 Percent At Different Blocks Of Hooghly District Each Packet Size Should Be 100gm Scheme Nfsnm Pulse, Sds And Rkvy 2025-07-12
-Withdrawing-And-Installation-Of-Pumping-Machinery-And-Other-Allied-Works-At-Kashinagar-Kalinagar-Mouza,-Akshyanagar,-Chandipur,-Gobindarampur,-Gangadharpur-And-Adjacent-W/s-Scheme-Under-Kakdwip-Block-Under-S.24pgs>India -Withdrawing-And-Installation-Of-Pumping-Machinery-And-Other-Allied-Works-At-Kashinagar-Kalinagar-Mouza,-Akshyanagar,-Chandipur,-Gobindarampur,-Gangadharpur-And-Adjacent-W/s-Scheme-Under-Kakdwip-Block-Under-S.24pgs>Wbphe/ee/smd/niet-11 Of 2025-26/15
Withdrawing And Installation Of Pumping Machinery And Other Allied Works At Kashinagar Kalinagar Mouza, Akshyanagar, Chandipur, Gobindarampur, Gangadharpur And Adjacent W/s Scheme Under Kakdwip Block Under S.24pgs
-Withdrawing-And-Installation-Of-Pumping-Machinery-And-Other-Allied-Works-At-Kashinagar-Kalinagar-Mouza,-Akshyanagar,-Chandipur,-Gobindarampur,-Gangadharpur-And-Adjacent-W/s-Scheme-Under-Kakdwip-Block-Under-S.24pgs>2025-07-12
India 01 - Nagar Chetra Baraut Me Vibhin Sthano Per Sadak Marammat Krane Ka Karya. 2025-07-12
-Dedicated/parallel-Pipe-Line-For-Better-Functionality-And-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-25m3/hr.-Capacity-Pressure-Type-Iron-Elimination>India -Dedicated/parallel-Pipe-Line-For-Better-Functionality-And-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-25m3/hr.-Capacity-Pressure-Type-Iron-Elimination>Wbphed/ee/md/niet_12 Of 2025-2026, Sl.no.02
Dedicated/parallel Pipe Line For Better Functionality And Design, Supplying. Fabrication, Erection And Commissioning Including 3 (three) Months Trial Run Of 25m3/hr. Capacity Pressure Type Iron Elimination
-Dedicated/parallel-Pipe-Line-For-Better-Functionality-And-Design,-Supplying.-Fabrication,-Erection-And-Commissioning-Including-3-(three)-Months-Trial-Run-Of-25m3/hr.-Capacity-Pressure-Type-Iron-Elimination>2025-07-12
-Construction-Of-Boundary-Wall-And-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-100-M3hr.-And-30-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With>India -Construction-Of-Boundary-Wall-And-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-100-M3hr.-And-30-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With>Wbphed/ee/md/niet_13 Of 2025-2026, Sl. No. 05
Construction Of Boundary Wall And Design, Supplying, Fabrication, Erection Commissioning Including 3 (three) Months Trial Run Of 100 M3hr. And 30 M3hr. Capacity Pressure Type Iron Elimination Plant With
-Construction-Of-Boundary-Wall-And-Design,-Supplying,-Fabrication,-Erection-Commissioning-Including-3-(three)-Months-Trial-Run-Of-100-M3hr.-And-30-M3hr.-Capacity-Pressure-Type-Iron-Elimination-Plant-With>2025-07-12
Whats app