Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Abr With Settler Madhya Kolorah Bhagar 2026-01-06
-Construction-Of-Concrete-Road-Reconstruction-Of-Damaged-Internal-Boundary-Wall-Drain-In-The-Campus-Of-Sub-Ordinate-Campus-Under-Purulia-Division-Pwd-During-The-Year-2025-2026.>India -Construction-Of-Concrete-Road-Reconstruction-Of-Damaged-Internal-Boundary-Wall-Drain-In-The-Campus-Of-Sub-Ordinate-Campus-Under-Purulia-Division-Pwd-During-The-Year-2025-2026.>Wbpwd/ee/prldn/niet_45/25-26/3
Construction Of Concrete Road Reconstruction Of Damaged Internal Boundary Wall Drain In The Campus Of Sub Ordinate Campus Under Purulia Division Pwd During The Year 2025-2026.
-Construction-Of-Concrete-Road-Reconstruction-Of-Damaged-Internal-Boundary-Wall-Drain-In-The-Campus-Of-Sub-Ordinate-Campus-Under-Purulia-Division-Pwd-During-The-Year-2025-2026.>2026-01-06
India Tender Invited For Basis For Sectors: Within The Same District Of Arunachal Pradesh , Rate Contract For Hiring Of Suv (non-ac)/muv (non-ac) For 200km/10hrs As & When Required Basis For Sectors: Within The Same District Of Arunachal Pradesh , Rate Contra 2026-01-06
India Tender Invited For Hiring Of 01 Nos Non Ac Road Vehicle Like Mahindra Scorpio, Mahindra Bolero And Equivalent For Official .#* Monthly Basis Cab & Taxi Hiring Services##quantity: 1## 2026-01-06
-Repairing-Of-Road-From-Bhanga-Rasta-To-Kusumuddin-House,-Mouza---Bangabari,-Jl-No---17.>India -Repairing-Of-Road-From-Bhanga-Rasta-To-Kusumuddin-House,-Mouza---Bangabari,-Jl-No---17.>19(e)/apas/omb /2025-2026/ Sl 10
Repairing Of Road From Bhanga Rasta To Kusumuddin House, Mouza - Bangabari, Jl No - 17.
-Repairing-Of-Road-From-Bhanga-Rasta-To-Kusumuddin-House,-Mouza---Bangabari,-Jl-No---17.>2026-01-06
-Supply-Of-Street-Light-Manantance-Material-Mattel-Fittinh/highmust/led-Fitting-Of-Bajaj-Crompton-Osram-Surya-Make-For-The-Yea>India -Supply-Of-Street-Light-Manantance-Material-Mattel-Fittinh/highmust/led-Fitting-Of-Bajaj-Crompton-Osram-Surya-Make-For-The-Yea>Manantance Material Mattel Fittinh/highmust/led Fitting Of Bajaj Crompton Osram Surya Make For The Year 2025-26 For Np Guna
Supply Of Street Light Manantance Material Mattel Fittinh/highmust/led Fitting Of Bajaj Crompton Osram Surya Make For The Yea
-Supply-Of-Street-Light-Manantance-Material-Mattel-Fittinh/highmust/led-Fitting-Of-Bajaj-Crompton-Osram-Surya-Make-For-The-Yea>2026-01-06
India Construction Of Cc Road From The H_o Abdul Alim And Giyas Mondal To The H_o Jamshed Mondal And Masjid At Booth No 193 Under Bhatjungla Gp Under Krishnagar_i Block Under Apas 2025_26. (id_apas_01_085_193_0001) Sl. No. 44 2026-01-06
India 11kv Ht Ct Ratio: 12.5 .#* 11kv Ht Ct Ratio: 12.5/1a With Lab Tested 1core Type: Wp, 1a Sec (current) Ilv: 15/38/95 K vp, 2.5 Va Burden Stc: 150xocf/1.2 Sec, 0.2s Class Freq: 50/60hz Phase: 1, S1-s2 Term Insulation Class: b [ Warranty Period: 30 Months Af 2026-01-06
India Supply, Installation, Testing, Commissioning, And Training Of A High-end Neuro-navigation System For Neurosurgery. Neuro-navigation System, Navigation Main Unit, Workstation, Medical-grade Cart, Optical Tracking System, Electromagnetic Tracking System, To 2026-01-06
India Rest Shed Near Paschim Jamtala Haribasar 2026-01-06
Whats app