Filter Search


Asia-Pacific


Location Summary Deadline
India Supply Of Glove Box Workstation For Research Laboratories. Glove Box Workstation 2026-01-01
India Installation Of Solar Street Light Soma Bachhar,pitish Sarkar,shefali Halder, Uttam Shikder, Monika Mondal, Mitali Mondal,sudip Bhakta And Sushanta Gharami Of Ps No-127 Under Kanchrapara Gp (apas/01/092/127/0003). 2026-01-01
India 9. Supply, Delivery, Erection And Commisioning Of 1 No. 9 Mtr. High Hot Dip Mini Mast Tower 6 X 120 Watt Ied Flood Light For Rishra Municipality ,ward No. 10, Booth No. 201 (under Apas Scheme, Id. No. Apas/01/186/201/0001) 2026-01-01
India Tender Invited For Wheel Shaft_pn_whs_u1200_30 , Cowl_fan Cover_pn_wu_fc_u1200_30 , Worm Shaft Oil Catcher_pn_wsoc_u1200_30 , Wheel Shaft Oil Catcher_pn_whsoc_u1200_30 , Worm Shaft_pn_ws_u1200_30 , Worm Wheel_pn_wwh_u1200_30 , Wheel Shaft_pn_whs_u1400_30 2026-01-01
India Construction Of Concrete Road From Tofajul House To Nilufa House At Jhunka Boro Bakultala Under Bhabta-ii Gp. (60 M X 3 M X 0.15 M) 2026-01-01
India Repairing Of Bathing Ghat Infront Of Sentu Molla Pond At Hareknagar Mollapara. L-6m,h-4.5m 2026-01-01
India Pr./lg Of Pvc Pipe In Rani Bagh Back Side Charan Gas 2026-01-01
India Hot Rolled Round Steel .#* Hot Rolled Round Steel Bar Isro 50 In The Length Of 5.5 To 13.5 Mtrs. Confo rming To Is: 1732-1989 (2 Nd Revision) For Dimension And Material Conforming To Is: 2062- 2011 (7 Th Revision) With Amendment No-1 Of Nov-2012, Grade E 2026-01-01
-Installation-Of-One-Submersible-In-Front-Of-Tarak-Pramanik-At-Napitpara>India -Installation-Of-One-Submersible-In-Front-Of-Tarak-Pramanik-At-Napitpara>94/aus-ii/bdo/booth-124/25-26
Installation Of One Submersible In Front Of Tarak Pramanik At Napitpara
-Installation-Of-One-Submersible-In-Front-Of-Tarak-Pramanik-At-Napitpara>2026-01-01
India Supply Of Various Materials And Services For The Construction Of Atvms (automatic Ticket Vending Machines). Automatic Ticket Vending Machines 2026-01-01
Whats app