Filter Search


Asia-Pacific


Location Summary Deadline
India Construction Of Road Reparing From Kapasdanga Majhpara Main Rastha Towards Delkach House (leanth 40 Mtr. Width 3 Mtr.) Apas/01/070/67/0012 2025-12-31
India Providing Footpath Beside Drain With Chequrred Terrazzo Tiles For Collectorate Road In Between Gaps Of Bt Road And Drain From Court Compound Road To Three Statues Center And Near Kankaragunta Flyover In Div No 23 Under Ae-5 Section. 2025-12-31
India Polyestermide Enameled Round Copper Winding Wire .#* Polyestermide Enameled Round Copper Winding Wire Class - 180, Grade - 2, M edium Covering Conforming To Is : 13730 (part - 8)/1996 (reaffirmed 2001) Size : 17 Swg (1.4 22 Mm) Dia. [ Warranty Period: 30 2025-12-31
India Tender Invited For Item No 1 , Item No 2 , Item No 3 , Item No 4 , Item No 5 , Item No 6 , Item No 7 , Item No 8 , Item No 9 , Item No 10 , Item No 11 , Item No 12 , Item No 13 , Item No 14 , Item No 15 , Item No 16 , Item No 17 , Item No 18 , Item No 19 2025-12-31
India Hydrographic & Topographical Survey & Submission Of Report Over Different Locations In Connection With Bank Protection Work On The Bank Of River Mahananda. 2025-12-31
India Supply Of Tools Required For Allied Works .#* Supply Of Tools Required For Allied Works , Supply, Fitment And Installation Of Air Pipeline And Its Fittings As Specified Annexure. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-12-31
-Development-Of-Foothpath-Ny-Laying-Paver-Block-Near-P-61-,-P-50-Dr--Sarat-Banerjee-Rd-Etc-In-Ward-No-90-,br-Viii-(apas/01/160/148/0003)>India -Development-Of-Foothpath-Ny-Laying-Paver-Block-Near-P-61-,-P-50-Dr--Sarat-Banerjee-Rd-Etc-In-Ward-No-90-,br-Viii-(apas/01/160/148/0003)>Kmc/dgc/viii/90/45/25-26/apas
Development Of Foothpath Ny Laying Paver Block Near P-61 , P-50 Dr- Sarat Banerjee Rd Etc In Ward No-90 ,br Viii (apas/01/160/148/0003)
-Development-Of-Foothpath-Ny-Laying-Paver-Block-Near-P-61-,-P-50-Dr--Sarat-Banerjee-Rd-Etc-In-Ward-No-90-,br-Viii-(apas/01/160/148/0003)>2025-12-31
India Repairing Of Ceiling Fans Of Barora Area, Rhb And Repairing Of Ac Installed In Apm Office Of Barora Area. 2025-12-31
India Repairing Cutting, Welding Of Base Plate For Motor, Rating 260 Kw And Pump Of 2000gpm Capacity Installed At Rajhara Colliery Under Rajhra Area. 2025-12-31
India Ttps Es Circle Em I Fault Attending And Replacing The Defective Parts And Cleaning Of Mv Lamp Fittings Tube Light Fittings And 15 5 Amps Plug Points In Unit I Ii Iii Tg Area 0 Mtr To 13 5 Mtr Ucb 6 6kv Control Room Dg Set Room Service Buildin 2025-12-31
Whats app