Filter Search


Asia-Pacific


Location Summary Deadline
India Supply, Erection, Testing And Commissioning Of ( I) 220/33 Kv Gis At Lingayapalem ,(ii) Laying Of 220kv Dc ,1000 Sqmm Xlpe Ug Cable From 400/220 Kv Gis Tallayapalem To 220/33kv Gis Lingayapalem(8 Km) And (iii) Laying Of 220kv Dc ,1000 Sqmm Xlpe Ug Cable B 2025-08-18
India Wire Rope Sling 06mm Dia 80cm Long To Is .#* Wire Rope Sling 06mm Dia 80cm Long To Is - 2266/2002, Both End Brazed Condition With 04 Nos. Of Suitable Bull Dog-c lamps To Is 2361/2002. Each Clamp To Be Supplied With 02 Nos. Of Suitable Spring Washer To Is 2025-08-18
-Expression-Of-Interest-(eoi)-For-Empanelment-Of-Hcos-(hospitals/stand-Alone/diagnostic-Centres)-In-Araria-District-Of-Bihar>India -Expression-Of-Interest-(eoi)-For-Empanelment-Of-Hcos-(hospitals/stand-Alone/diagnostic-Centres)-In-Araria-District-Of-Bihar>Expression Of Interest (eoi) For Empanelment Of Hcos (hospitals/stand Alone/diagnostic Centres) In Araria District Of Bihar
Expression Of Interest (eoi) For Empanelment Of Hcos (hospitals/stand Alone/diagnostic Centres) In Araria District Of Bihar
-Expression-Of-Interest-(eoi)-For-Empanelment-Of-Hcos-(hospitals/stand-Alone/diagnostic-Centres)-In-Araria-District-Of-Bihar>2025-08-18
India Construction Of C.c Road And Drain From H/o Pandit Ji To H/o Bangali Ward No. 07 2025-08-18
India Relining/lining Of Water Course Of Outlet Rd 16629/r Of Muktsar Disty. Village Chak Bir Sarkar District Sri Muktsar Sahib. 2025-08-18
India Drivers Display Unit .#* Drivers Display Unit (ddu) As Per Clws Specification No. Clw/es/3/0487/c Or Latest For wap-7 And Wag-9 Locos [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-18
India Supply Of B 150,175,200 Mast .#* Core Id 4200001002 Supply Of Mast B 200 T Spec: Is_2062,is_808, Drw: Eti C 0071, Str: C ore-str-01, Core-str-01 Or Latest. [ Warranty Period: 30 Months After The Date Of Delivery ] ] 2025-08-18
India Augmentation Of Existing Water Supply Scheme And Providing Fhtcs To Jonnathali Habitation And Gp Of Martur Mandal Of Bapatla District,est.cost Rs.19.18 Lakhs 2025-08-18
Singapore Proposed Design And Build For Addition And Alteration Works At Changi East Project Office (cepo) 2025-08-18
-Daily-Operation-Maintenance-Of-Distribution-System,-Opening-And-Closing-Sluice-Valves-With-All-Allied-Works-Related-To-Water-Supply-Under-Madandih-W/s-Scheme-(zone-i)-Of-Raghunathpur-Sub-division-Under-Purulia-Division,-P.>India -Daily-Operation-Maintenance-Of-Distribution-System,-Opening-And-Closing-Sluice-Valves-With-All-Allied-Works-Related-To-Water-Supply-Under-Madandih-W/s-Scheme-(zone-i)-Of-Raghunathpur-Sub-division-Under-Purulia-Division,-P.>Wbphed/09/pd/2025-26/sl.25
Daily Operation Maintenance Of Distribution System, Opening And Closing Sluice Valves With All Allied Works Related To Water Supply Under Madandih W/s Scheme (zone-i) Of Raghunathpur Sub-division Under Purulia Division, P.
-Daily-Operation-Maintenance-Of-Distribution-System,-Opening-And-Closing-Sluice-Valves-With-All-Allied-Works-Related-To-Water-Supply-Under-Madandih-W/s-Scheme-(zone-i)-Of-Raghunathpur-Sub-division-Under-Purulia-Division,-P.>2025-08-18
Whats app