Filter Search


Asia-Pacific


Location Summary Deadline
India Renovation Of A2 Bunglow At Gsecltps Ukai.(wt- 4904-a Civil Colony) 2025-08-18
India Tender Invited For , Custom Bid For Services - Supply Of Spare Parts Oblique Materials As And When Required For Ro Systems Common Items For 2000 And 1000 Lph Ro Plants Dosing Pump 6lph 4kg As Per Annexure E Qty 1 No , Custom Bid For Services - Supply Of S 2025-08-18
India Tender Invited For All In One Pc (v2) (q2)##quantity: 1922## 2025-08-18
Russian Federation Home ? Open Competition In Electronic Form No. 1667/oke-cdpo/25 For The Right To Conclude Contracts For The Provision Of Services For Comprehensive Maintenance And Current Repairs Of Modular Toilet Complexes 2025-08-18
India Tender Invited For Flood Light; Led, 1620w, 230- 400v, 162klm##quantity: 12## 2025-08-18
India Step Rail, Length 780mm .#* Step Rail, Length 780mm, As Per Drg. No: Icf/sk-4-1-007, Item No-2. [ Warranty Period: 30 months After The Date Of Delivery ] [quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Value Variation Permitted: max 2025-08-18
Philippines Proposed Road Concrete And Salary, Uan, Easternomers. 2025-08-18
-Daily-Operation-And-Mtc.-Of-Distribution-System,-Sluice-Valve,-Community-Stand-Post-Etc.-Under-Arrah-W/s-Scheme-(zone-i)-Of-Raghunathpur-Sub-division-Under-Purulia-Division,-P.h.e.-Dte.(w.e.f.-01.09.2025-To-31.08.2026)>India -Daily-Operation-And-Mtc.-Of-Distribution-System,-Sluice-Valve,-Community-Stand-Post-Etc.-Under-Arrah-W/s-Scheme-(zone-i)-Of-Raghunathpur-Sub-division-Under-Purulia-Division,-P.h.e.-Dte.(w.e.f.-01.09.2025-To-31.08.2026)>Wbphed/09/pd/2025-26/sl.1
Daily Operation And Mtc. Of Distribution System, Sluice Valve, Community Stand Post Etc. Under Arrah W/s Scheme (zone-i) Of Raghunathpur Sub-division Under Purulia Division, P.h.e. Dte.(w.e.f. 01.09.2025 To 31.08.2026)
-Daily-Operation-And-Mtc.-Of-Distribution-System,-Sluice-Valve,-Community-Stand-Post-Etc.-Under-Arrah-W/s-Scheme-(zone-i)-Of-Raghunathpur-Sub-division-Under-Purulia-Division,-P.h.e.-Dte.(w.e.f.-01.09.2025-To-31.08.2026)>2025-08-18
India Hq_med_zrc_[ph.no.21143] Formetrol Fumarate 20 Mcg + Budesonide 0.5 Mg Respules .#* Hq_med_zrc_[ph.no.21143] Formetrol Fumarate 20 Mcg + Budesonide 0.5 Mg R espules ] 2025-08-18
India Design And Construction Of Elevated Metro Viaduct Of Length 20.527 Kms Between Ug Ramp And Balkum Naka Including Depot Approach Viaduct And Three Special Spans For Thane Integral Ring Metro Project. 2025-08-18
Whats app