Filter Search


Asia-Pacific


Location Summary Deadline
-Construction-Of-Cross-Drain-With-Cover-Slab-At-445-To-445/1/1-Sarat-Chatterjee-Road,-Within-Hmc-Area-,apas-Fund,-Ward-No.40-Defect-Liability-Period-01-Year.>India -Construction-Of-Cross-Drain-With-Cover-Slab-At-445-To-445/1/1-Sarat-Chatterjee-Road,-Within-Hmc-Area-,apas-Fund,-Ward-No.40-Defect-Liability-Period-01-Year.>Wb-hmc/tn/ed/sandd/31/25-26_06
Construction Of Cross Drain With Cover Slab At 445 To 445/1/1 Sarat Chatterjee Road, Within Hmc Area ,apas Fund, Ward No.40 Defect Liability Period 01 Year.
-Construction-Of-Cross-Drain-With-Cover-Slab-At-445-To-445/1/1-Sarat-Chatterjee-Road,-Within-Hmc-Area-,apas-Fund,-Ward-No.40-Defect-Liability-Period-01-Year.>2025-12-26
-Constraction-Of-New-Drain-With-Cover-Slab-From-Purba-Pally-Club-To-H/o-Somanth-Pattanayak,-A.t.ghosh-Road-4th-Bye-Lane,-Within-Hmc-Area-,apas-Fund,-Ward-No.47-Defect-Liability-Period-01-Year.>India -Constraction-Of-New-Drain-With-Cover-Slab-From-Purba-Pally-Club-To-H/o-Somanth-Pattanayak,-A.t.ghosh-Road-4th-Bye-Lane,-Within-Hmc-Area-,apas-Fund,-Ward-No.47-Defect-Liability-Period-01-Year.>Wb-hmc/tn/ed/sandd/31/25-26_53
Constraction Of New Drain With Cover Slab From Purba Pally Club To H/o Somanth Pattanayak, A.t.ghosh Road 4th Bye Lane, Within Hmc Area ,apas Fund, Ward No.47 Defect Liability Period 01 Year.
-Constraction-Of-New-Drain-With-Cover-Slab-From-Purba-Pally-Club-To-H/o-Somanth-Pattanayak,-A.t.ghosh-Road-4th-Bye-Lane,-Within-Hmc-Area-,apas-Fund,-Ward-No.47-Defect-Liability-Period-01-Year.>2025-12-26
India Single Core 95 Sq Mm .#* Single Core 95 Sq Mm Heat Resistance Cable With Stranded Bare Copper Conductor To Is : 8130 Of 1984. Insulated With Sintered Ptfe 0.6 Mm Approx. Overall Fibre Glass Braiding With High Te mperature Ceramic Yarn Insulation Compounde 2025-12-26
India Bottom Bush To Icf .#* Top Bush To Drg. No. Emu/m-0-6-005/2 ,alt.- K/2 [ Warranty Period: 30 Months After The date Of Delivery ] ] 2025-12-26
-Supply,-Installation-And-Commissioning-Of-1-X-40-Watt-Led-Light-Including-Erecting-Of-7.0m-St-Pole-Ms-Etc-All-Completed-In-All-Respect-At-Different-Places-Under-Dharampur-Gp.-Toal-21-Nos>India -Supply,-Installation-And-Commissioning-Of-1-X-40-Watt-Led-Light-Including-Erecting-Of-7.0m-St-Pole-Ms-Etc-All-Completed-In-All-Respect-At-Different-Places-Under-Dharampur-Gp.-Toal-21-Nos>Installation And Commissioning
Supply, Installation And Commissioning Of 1 X 40 Watt Led Light Including Erecting Of 7.0m St Pole Ms Etc All Completed In All Respect At Different Places Under Dharampur Gp. Toal 21 Nos
-Supply,-Installation-And-Commissioning-Of-1-X-40-Watt-Led-Light-Including-Erecting-Of-7.0m-St-Pole-Ms-Etc-All-Completed-In-All-Respect-At-Different-Places-Under-Dharampur-Gp.-Toal-21-Nos>2025-12-26
-Removal,-Transportation,-Installation-And-Commissioning-Of-Submersible-Pump-Motor-Set-At-16a,-P.-A.-Shah-Road-Head-Works>India -Removal,-Transportation,-Installation-And-Commissioning-Of-Submersible-Pump-Motor-Set-At-16a,-P.-A.-Shah-Road-Head-Works>Kmc/ws/hw/2025-26/16
Removal, Transportation, Installation And Commissioning Of Submersible Pump Motor Set At 16a, P. A. Shah Road Head Works
-Removal,-Transportation,-Installation-And-Commissioning-Of-Submersible-Pump-Motor-Set-At-16a,-P.-A.-Shah-Road-Head-Works>2025-12-26
India Providing Drain Slab In Near Kashim Dulle Makan At Ward No 72 2025-12-26
India Tender Invited For Repair Of Power Tool Part No. Cdr4450 , Repair Of Power Tool Part No. Ct4850 , Repair Of Impact Wrench Part No. Ct4410a##quantity: 3## 2025-12-26
India Construction Of 200mm Pvc Pipe And Related Work From Bacha Hasmi To Ward No 06 Chandni Chowk Gorakh Seith In Ward No 05 Lohiya Nagar. 200mm Pvc Pipe 2025-12-26
India Tender Invited For Cobbler Shed (q3)##quantity: 2## 2025-12-26
Whats app