Filter Search


Asia-Pacific


Location Summary Deadline
-Repairing-Of-110kw-Sewage-Pump-Set,-Sluice-Valve-At-Pump-No-1-And-Replacement-Of-Sluice-Valve-At-Delivery-Site-In-Isls-i,-Aa-i-Under-Ntk-Project.>India -Repairing-Of-110kw-Sewage-Pump-Set,-Sluice-Valve-At-Pump-No-1-And-Replacement-Of-Sluice-Valve-At-Delivery-Site-In-Isls-i,-Aa-i-Under-Ntk-Project.>Repair_pump
Repairing Of 110kw Sewage Pump Set, Sluice Valve At Pump No 1 And Replacement Of Sluice Valve At Delivery Site In Isls-i, Aa-i Under Ntk Project.
-Repairing-Of-110kw-Sewage-Pump-Set,-Sluice-Valve-At-Pump-No-1-And-Replacement-Of-Sluice-Valve-At-Delivery-Site-In-Isls-i,-Aa-i-Under-Ntk-Project.>2026-01-03
-Development-Of-C.c.-Road-At-Jiyadergote-(slum-Area)-Near-H/o-badal-Mondal-In-Ward-No-142>India -Development-Of-C.c.-Road-At-Jiyadergote-(slum-Area)-Near-H/o-badal-Mondal-In-Ward-No-142>Kmc/e.e.(c)/br-xvi/ 142/058/25-26/bustee
Development Of C.c. Road At Jiyadergote (slum Area) Near H/o-badal Mondal In Ward No-142
-Development-Of-C.c.-Road-At-Jiyadergote-(slum-Area)-Near-H/o-badal-Mondal-In-Ward-No-142>2026-01-03
-Improvement-Of-Paver-Block-Footpath-At-19/1-Alipore-Road-And-Srrounding-Area-In-Ward-74-(apas/01/159/84/0004)>India -Improvement-Of-Paver-Block-Footpath-At-19/1-Alipore-Road-And-Srrounding-Area-In-Ward-74-(apas/01/159/84/0004)>Kmc/d.g.(c)/ Ix/074/112/2025-2026/apas
Improvement Of Paver Block Footpath At 19/1 Alipore Road And Srrounding Area In Ward 74 (apas/01/159/84/0004)
-Improvement-Of-Paver-Block-Footpath-At-19/1-Alipore-Road-And-Srrounding-Area-In-Ward-74-(apas/01/159/84/0004)>2026-01-03
-Installation-Of-Lighting-System-Including-Beautification-With-Decorative-Poles-And-Led-Luminaires-For-Different-Ghats-On-The-Bank-Of-Tolly-Nullah-In-Ward-No--83,-Under-Br--Viii,>India -Installation-Of-Lighting-System-Including-Beautification-With-Decorative-Poles-And-Led-Luminaires-For-Different-Ghats-On-The-Bank-Of-Tolly-Nullah-In-Ward-No--83,-Under-Br--Viii,>Kmc/d.g. (p-d)/e/032/2025-26
Installation Of Lighting System Including Beautification With Decorative Poles And Led Luminaires For Different Ghats On The Bank Of Tolly Nullah In Ward No- 83, Under Br- Viii,
-Installation-Of-Lighting-System-Including-Beautification-With-Decorative-Poles-And-Led-Luminaires-For-Different-Ghats-On-The-Bank-Of-Tolly-Nullah-In-Ward-No--83,-Under-Br--Viii,>2026-01-03
>India >Wbmad/c/hcm/eng/ Apas/ Nit21/12e/25/11, Construction Ofnew Drain, Renovation Of Drain, Construction Of Slab At House, Const Renovation, Construction Of Road, Pond Development, Construction Of Concrete Road Apas, Under Hooghly-chinsurah Municipality.
>2026-01-03
India Construction Concrete Road From Rampada Dolai House To Basudeb Dolai House Under 34 Hatgechia Pri School_r1_apas/01 /230/33/0002 2026-01-03
India Tender Invited For Enerseal A&p Gskt. Type##quantity: 4## 2026-01-03
-Construction-Of-Pcc-Road-From-Bablu-Mahato-House-To-Satpati-Bundh>India -Construction-Of-Pcc-Road-From-Bablu-Mahato-House-To-Satpati-Bundh>03/abgp/2025-26
Construction Of Pcc Road From Bablu Mahato House To Satpati Bundh
-Construction-Of-Pcc-Road-From-Bablu-Mahato-House-To-Satpati-Bundh>2026-01-03
-Repairing-Of-Cc-Road-From-Falgunie-Dey-House-To-Ukil-Roy-House-80-Mtr-Part-No-15/50-Under-Salbari-ii-Gp-Within-Banarhat-Development-Block-Under-Apas-Fund.-(scheme-Id-apas/01/015/50/0005)>India -Repairing-Of-Cc-Road-From-Falgunie-Dey-House-To-Ukil-Roy-House-80-Mtr-Part-No-15/50-Under-Salbari-ii-Gp-Within-Banarhat-Development-Block-Under-Apas-Fund.-(scheme-Id-apas/01/015/50/0005)>E-nit No Banarhat/bdo/nit-029/2025-26 / 33
Repairing Of Cc Road From Falgunie Dey House To Ukil Roy House 80 Mtr Part No-15/50 Under Salbari-ii Gp Within Banarhat Development Block Under Apas Fund. (scheme Id-apas/01/015/50/0005)
-Repairing-Of-Cc-Road-From-Falgunie-Dey-House-To-Ukil-Roy-House-80-Mtr-Part-No-15/50-Under-Salbari-ii-Gp-Within-Banarhat-Development-Block-Under-Apas-Fund.-(scheme-Id-apas/01/015/50/0005)>2026-01-03
India Procurement Of Kit Of Stabilizing Valve (ii80275) Consisting Of 10 Items Etc. .#* Kit Of Stabilizing Valve (ii80275) Consisting Of 10 Items For 2nd Poh As Per Annexure [ Warra nty Period: 30 Months After The Date Of Delivery ] ] 2026-01-03
Whats app