Filter Search


Asia-Pacific


Location Summary Deadline
-Ioh-Kit-Of-Spares-For-Air-Dryer-Of-M/s.-Sil-Consisting-Of-17-Items-As-Perannexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Va>India -Ioh-Kit-Of-Spares-For-Air-Dryer-Of-M/s.-Sil-Consisting-Of-17-Items-As-Perannexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Va>Supply Of Ioh Kit Of Spares
Ioh Kit Of Spares For Air Dryer Of M/s. Sil Consisting Of 17 Items As Perannexure Attached. [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Total Po Va
-Ioh-Kit-Of-Spares-For-Air-Dryer-Of-M/s.-Sil-Consisting-Of-17-Items-As-Perannexure-Attached.-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Total-Po-Va>2025-06-02
India Maintenance Of Park In Variour Ward Of Raisen 2025-06-02
India Supply Of Vertical Turning Lathe For Elsd/ed 2025-06-02
India Supply Of Digital Fundus Camera For Use In Health Department, U.t., Chandigarh. 2025-06-02
-Laying-Balance-Hdpe-Pipe-Within-Left-Out-Mouzas/habitations-Of-Dubirbheri-Pwss-Under-Different-Block-Of-Chinsurah-Sub-Division-Of-Hooghly-Division,-P.h.e-Dte>India -Laying-Balance-Hdpe-Pipe-Within-Left-Out-Mouzas/habitations-Of-Dubirbheri-Pwss-Under-Different-Block-Of-Chinsurah-Sub-Division-Of-Hooghly-Division,-P.h.e-Dte>Wbphe/ee/10/hug/2025-26, Sl-6
Laying Balance Hdpe Pipe Within Left Out Mouzas/habitations Of Dubirbheri Pwss Under Different Block Of Chinsurah Sub Division Of Hooghly Division, P.h.e Dte
-Laying-Balance-Hdpe-Pipe-Within-Left-Out-Mouzas/habitations-Of-Dubirbheri-Pwss-Under-Different-Block-Of-Chinsurah-Sub-Division-Of-Hooghly-Division,-P.h.e-Dte>2025-06-02
qty:1
>India
qty:1
>Tender Invited For C Arm Fluoroscope X - Ray Machine (v2) (q2)
qty:1
qty:1
>2025-06-02
India Sale Of Property By Home First Finance Company India Limited, Mumbai V/s. Bhakti Shaileshbhai Matravadiya 2025-06-02
-Laying-Balance-Pipe-Line-For-Providing-Fhtc-At-Shibrambati-Zone-i-Water-Supply-Scheme-Under-Chandannagar-Sub-division-Of-Hooghly-Division-P.h.e-Dte.>India -Laying-Balance-Pipe-Line-For-Providing-Fhtc-At-Shibrambati-Zone-i-Water-Supply-Scheme-Under-Chandannagar-Sub-division-Of-Hooghly-Division-P.h.e-Dte.>Wbphe/ee/10/hug/2025-26, Sl-19
Laying Balance Pipe Line For Providing Fhtc At Shibrambati Zone-i Water Supply Scheme Under Chandannagar Sub-division Of Hooghly Division P.h.e Dte.
-Laying-Balance-Pipe-Line-For-Providing-Fhtc-At-Shibrambati-Zone-i-Water-Supply-Scheme-Under-Chandannagar-Sub-division-Of-Hooghly-Division-P.h.e-Dte.>2025-06-02
qty:252
>India
qty:252
>Tender Invited For Octagonal Pole With Single Arm Or Double Arm Brackets (v2) (q3), Led Luminaire For Road Street Lights (v2) Conforming To Is 10322 (part 5 / Section 3) (q3)
qty:252
qty:252
>2025-06-02
India Construction Of Works Under Deposit Head Of Sbpdcl For Height Raising Of 11kv Akbarnagar Feeder Between Bairiya Diyara And Mohanpur Diyara In Nathnagar Block Due To Obstruction In Navigational Channel In National Waterways-i (river Ganga) (includes 2 Nos. 2025-06-02
Whats app