Filter Search


Asia-Pacific


Location Summary Deadline
India Part-a) Shifting Of Existing 33/0.4kv Substation No-2 From West Colony Bhopal To new Location. Part-b) Bhopal- Construction Of Rpf Post Building Platform No.1 With furniture. 2025-12-26
India Sc-dhne Section: (den/lines/hyb): Provision Of Safety Fencing/boundary Wall along The Track For Speed 130 Kmph And Above Using Nhai Anti-crash Barrier / W beam For 76.20 Km Fencing Length 2025-12-26
India Refurbishment Of Ctrb Uic - 130 Of Lhb Coach Axle Box Bearing, Timken Make fitted In Lhb Coach. 2025-12-26
India Hiring Of Machineries For Restoration Of Traffic (up Line And Dn Line) At Km 524/29- 35 Due To Derailment Of Train No Pp/boy/bscs (loco No 31856/31839) On 29-10-25 to 31/10/2025 For Removal Of Debris, Derailed Materials, Damaged P.way Materials etc. 2025-12-26
India Provision Of Intrusion Detection System For Monitoring The Elephant Movement with Tracking And Level Crossing Alert In Pbw-lku-hdw Section Of Izn Division 2025-12-26
India Godhara - Nagda Section :- Trr(p) 2.73 Tkm And Casual Rail Renewal Under Aden/e/rtm and Aden/s/dhd Section. 2025-12-26
India Katni-bina:- "katni-bina:- "new Goods Shed At Pathariya & Khurai For Provision Of 01 Loading Line Each" Under Jurisdiction Of Senior Divisional Engineer (west). 2025-12-26
India Standardization And Upgradation Work At Lc Gates (i.e. Improvement Of Level crossing Gate Lodge, Toilet Block, Water Supply, Surfacing Of Road And Provision Of standard Height Gauge Fencing Etc.) Lc No. 312, 324, 326, 327, 328, 329, 331, 332,336,338, 339, 2025-12-26
India Electrical Work In Connection With The Work Of "chunar Jn. Provision Of Additional 6.10 M Fob With Other Connected Works At Chunar (car) Station Of Prayagraj division. Electrical Work In Connection With The Work Of "pryj : Raising Of Platform no 3/4 To Hi 2025-12-26
India "outsourcing Of Works Relatd To Repairs Of Wagons At Roh Depot, Ajni In Nagpur division For A Period Of 24 Months". 2025-12-26
Whats app