Filter Search


Asia-Pacific


Location Summary Deadline
India Led Light Fitting .#* Led Light Fitting Type-b1, 9 Watt As Per Rdso Specification No. Rdso/pe/spec/tl/0091-2016 , (rev.1) Rcf Annexure-1,2,3 And As Per Rcf Drawing No. Cc-76453. [ Warranty Period: 30 Months Afte r The Date Of Delivery ] ] 2025-08-04
India Work Of Construction Of 04 Nos. Isolation Stopping (fly Ash Bricks) Including All Materials In Main Dip In Lws At Tawa-ii Mine, Pathakhera Area, Wcl 2025-08-04
-Please-Refer-Boq>India -Please-Refer-Boq>Constt.of Csc At Ladwani Mohallah Nlo Rashid
Please Refer Boq
-Please-Refer-Boq>2025-08-04
-As-Per-Nit>India -As-Per-Nit>Work No. 47 Out Of 116 Sfc Nirman Works.
As Per Nit
-As-Per-Nit>2025-08-04
India Procurement Of Silica Gel Material For Gt 7,1t,r1,r2 And 10t Transformers Of 1x110, Cmri For Abt Meters, Esp Spares And Lt Motors Dtps Unit Of Htps Kasimpur 2025-08-04
India An Estimate For Extension Of 33kv Line From 33kv Boida-bandhakhar Tapping To 132kv S/s Renki Under Chaitma Dc Under O&m Dn.,cspdcl., Katghora. Pr No. 10069067 Estt. No. B767607625.0003 Dtd. 04.07.2025 2025-08-04
India 01. Estimate For Replacement Of 10 No. 140 Kg 8.0 Mtr Long Pcc Pole Damage Of 11 Kv Line At Various Village Under Katekalyan Dc. Of (o&m) Dn. Dantewadaestimate No. :-j507833p25.0001 Dt. 01.07.2025o&m W/o No : 1114 Dt. 07.07.202502. "estimate For Replaceme 2025-08-04
India Supply Of Spare Parts Of Ion Chromatography System 2025-08-04
India Sell Of Shop Number-13 (ground Floor) In Saf Site Under Pmay Scheme 2025-08-04
-Estimate-If-Pre-Paired-As-Per-Sor-Of-Pwd-With-Effect.>India -Estimate-If-Pre-Paired-As-Per-Sor-Of-Pwd-With-Effect.>Renovation At Shiv Mandir At Muktidham.
Estimate If Pre Paired As Per Sor Of Pwd With Effect.
-Estimate-If-Pre-Paired-As-Per-Sor-Of-Pwd-With-Effect.>2025-08-04
Whats app