Filter Search


Asia-Pacific


Location Summary Deadline
India Automated Hydraulic Bearing Extractor With One Year Consumables. .#* Automated Hydraulic Bearing Extractor With One Year Consumables. As Per Attached Specific ation. Make - Sumanglam, G.m. Liba, Inventum, Siloman Or Equivalent. [ Warranty Period: 30 Month 2025-12-30
Malaysia Proposal To Upgrade The Dwharf Esplanade Under The Sarawak Village Entrepreneur Transformation Program (tuds) 2025-12-30
India Construction Of Foot Bridge On Nallah Mawer At Reshwari Nowgam 2025-12-30
India Improvement Work Of Village Tank Of Survey No.06 At Village : Baspa Ta:-sami Dist:- Patan(second Try) 2025-12-30
-Empanelment-Of-Contractors-And-Finalization-Of-Labour-Rates-For-Execution-Of-Electrical-Works-Upto-11-Kv-Ht-Lt-Level-Strictly-As-Per-Nigams-Standard-Design-And-Specification-In-The-Area-Under-Jurisdiction-Of-Op-Circle-Dhbvn>India -Empanelment-Of-Contractors-And-Finalization-Of-Labour-Rates-For-Execution-Of-Electrical-Works-Upto-11-Kv-Ht-Lt-Level-Strictly-As-Per-Nigams-Standard-Design-And-Specification-In-The-Area-Under-Jurisdiction-Of-Op-Circle-Dhbvn>Nit-02/se/op/rwr/2025-26
Empanelment Of Contractors And Finalization Of Labour Rates For Execution Of Electrical Works Upto 11 Kv Ht Lt Level Strictly As Per Nigams Standard Design And Specification In The Area Under Jurisdiction Of Op Circle Dhbvn
-Empanelment-Of-Contractors-And-Finalization-Of-Labour-Rates-For-Execution-Of-Electrical-Works-Upto-11-Kv-Ht-Lt-Level-Strictly-As-Per-Nigams-Standard-Design-And-Specification-In-The-Area-Under-Jurisdiction-Of-Op-Circle-Dhbvn>2025-12-30
India Upgradation Of Muktidham And Additional Facility At Ward No. 09. Upgradation Of Muktidham, Additional Facility At Ward No. 09 2025-12-30
India Renovation Of Toilets, External Painting Of Officers Quarters And Other Miscellaneous Repair Works In Branch Office At Talcher Under Cuttack Division. 2025-12-30
India Ward No.22 Moh. Amanzai Jalanagar Me Kisano Vali Gali Me Umakant Ki Chakki Se Mandir Ke Pas Tk C.c. Sadak Va Nali, Puliya Nirman Karya. 2025-12-30
>India >I)construction Of Cc Road From Sk.istak House Towards Md.ali House At Dkhsiza -1 Villageapas/01/289/176/011, Ii)construction Of Cc Road From Sk.sirajul House Towards Sk. Khadim House At Dkhsiza -1 Village, Apas/01/289/176/011 Iii)construction Of Cc
>2025-12-30
-Bid-Document-Of-Proposed-Sewerage-Pipe-Line-System-With-Pumping-Station,-Rising-Main,-Electro-Mechanical-Work-&-House-Service-Connection-With-Operation-&-Maintenance-For-Next-24-Months-Of-Kheda-Nagarpalika>India -Bid-Document-Of-Proposed-Sewerage-Pipe-Line-System-With-Pumping-Station,-Rising-Main,-Electro-Mechanical-Work-&-House-Service-Connection-With-Operation-&-Maintenance-For-Next-24-Months-Of-Kheda-Nagarpalika>Sjmmsvy Ugp Part-2
Bid Document Of Proposed Sewerage Pipe Line System With Pumping Station, Rising Main, Electro Mechanical Work & House Service Connection With Operation & Maintenance For Next 24 Months Of Kheda Nagarpalika
-Bid-Document-Of-Proposed-Sewerage-Pipe-Line-System-With-Pumping-Station,-Rising-Main,-Electro-Mechanical-Work-&-House-Service-Connection-With-Operation-&-Maintenance-For-Next-24-Months-Of-Kheda-Nagarpalika>2025-12-30
Whats app