Filter Search


Asia-Pacific


Location Summary Deadline
-Solid-West-Management-Plant-Ko-Punh-Sanchalan-Hetu.>India -Solid-West-Management-Plant-Ko-Punh-Sanchalan-Hetu.>Work
Solid West Management Plant Ko Punh Sanchalan Hetu.
-Solid-West-Management-Plant-Ko-Punh-Sanchalan-Hetu.>2025-05-26
India Hiring And Operating Of 7(seven) Nos. 4wd Light Motor Vehicles (viz. Scorpio/bolero/tata Sumo Or Similar) For The Movement Of Dy Ce/con-iv/ Imphal, Xen/axen, Sse/je/works, Security And 1 (one) Nos. Multi-utility Vehicle For Sse/je/works For Inspection & S 2025-05-26
India Carrying Of Food Stuff (including Rte) And Other Icds Materials For 42 (fourty Two) Icds Projects 2025-05-26
Philippines 25mg0108- Concreting Of Purok Balite To Crossing Bungo, Brgy. San Jose Fmr Phase Ii, Brgy. San Jose, Norala, South Cotabato 2025-05-26
India Expression Of Interest For Design Development Of Stall Warning Horn For Dornier Do-228 Aircraft 2025-05-26
-Sinking-Of-1no.-Tube-well-By-D.r.-Rig-Method,-Construction-Of-5.40-M-X-3.60-M-Switch-Room-With-Sanitary-And-Water-Supply-Arrangement,-Construction-Of-Boundary-Wall-And-Connection-Of-Tubewell-Of-Rasulpur-Pwss>India -Sinking-Of-1no.-Tube-well-By-D.r.-Rig-Method,-Construction-Of-5.40-M-X-3.60-M-Switch-Room-With-Sanitary-And-Water-Supply-Arrangement,-Construction-Of-Boundary-Wall-And-Connection-Of-Tubewell-Of-Rasulpur-Pwss>Wbphe/ee/07/hug/2025-26, Sl-6
Sinking Of 1no. Tube-well By D.r. Rig Method, Construction Of 5.40 M X 3.60 M Switch Room With Sanitary And Water Supply Arrangement, Construction Of Boundary Wall And Connection Of Tubewell Of Rasulpur Pwss
-Sinking-Of-1no.-Tube-well-By-D.r.-Rig-Method,-Construction-Of-5.40-M-X-3.60-M-Switch-Room-With-Sanitary-And-Water-Supply-Arrangement,-Construction-Of-Boundary-Wall-And-Connection-Of-Tubewell-Of-Rasulpur-Pwss>2025-05-26
India Request For Proposal For Appointment Of Consultant For The Preparation Of Zonal Development Plan For Zone 5. 2025-05-26
India The Work Of Continuous Patrolling, Functioning Of Canal And Vigilant Inspection Of Kachchh Branch Canal Ch. 325.391 Km To Ch.357.185 Km (package - Ir 17-22) For Period Of Two Years. 2025-05-26
India Renovation Work Of Atal Awas Suncity Chandra Shekhar Ajad Ward No 41 (balance Works). 2025-05-26
-Procurement,-Supply,-Installation,-Testing-And-Commissioning-Including-Warranty-Obligation-Of-One-No.-1.25-Mw-Solar-Inverter-At-Chharrah-10mw-(ac)-Solar-Pv-Power-Plan>India -Procurement,-Supply,-Installation,-Testing-And-Commissioning-Including-Warranty-Obligation-Of-One-No.-1.25-Mw-Solar-Inverter-At-Chharrah-10mw-(ac)-Solar-Pv-Power-Plan>Wbsedcl/spgd/ Solar Inverter 10 Mw Spvpp Chharrah /2025-26/nit- 72 Date 28.04.2025
Procurement, Supply, Installation, Testing And Commissioning Including Warranty Obligation Of One No. 1.25 Mw Solar Inverter At Chharrah 10mw (ac) Solar Pv Power Plan
-Procurement,-Supply,-Installation,-Testing-And-Commissioning-Including-Warranty-Obligation-Of-One-No.-1.25-Mw-Solar-Inverter-At-Chharrah-10mw-(ac)-Solar-Pv-Power-Plan>2025-05-26
Whats app