Filter Search


Asia-Pacific


Location Summary Deadline
India Deployment Of Technical And Supporting Manpower (for Survey Section) Under Ro, Iwai, Guwahati On Outsourcing Basis During 2024-25 2024-10-22
Taiwan Province of China Led Display Panel And Led Display Screen 2024-10-22
-Construction-Of-Cement-Concrete-Road-From-The-House-Of-Tapan-Mishra-Of-Shibgunj-To-The-House-Of-Murari-Maity-Link-Road-From-Masjid-To-Asutosh-Giris-House>India -Construction-Of-Cement-Concrete-Road-From-The-House-Of-Tapan-Mishra-Of-Shibgunj-To-The-House-Of-Murari-Maity-Link-Road-From-Masjid-To-Asutosh-Giris-House>Wbsdb/ee/ Ced-iv/nit-02(e)/2024-25/11
Construction Of Cement Concrete Road From The House Of Tapan Mishra Of Shibgunj To The House Of Murari Maity Link Road From Masjid To Asutosh Giris House
-Construction-Of-Cement-Concrete-Road-From-The-House-Of-Tapan-Mishra-Of-Shibgunj-To-The-House-Of-Murari-Maity-Link-Road-From-Masjid-To-Asutosh-Giris-House>2024-10-22
Philippines Information Technology (pr-2024-1011-0271) 2024-10-22
-Restoration-Of-Asphaltum-Road-And-I.p.s-Footpath-Including-Ancillary-Work-At-Suri-Lane,-Creek-Row-And-Different-Placess-In-Ward--50-Under-Borough-v.>India -Restoration-Of-Asphaltum-Road-And-I.p.s-Footpath-Including-Ancillary-Work-At-Suri-Lane,-Creek-Row-And-Different-Placess-In-Ward--50-Under-Borough-v.>Kmc/ee(c)/br-v/50/31/24-25
Restoration Of Asphaltum Road And I.p.s Footpath Including Ancillary Work At Suri Lane, Creek Row And Different Placess In Ward -50 Under Borough-v.
-Restoration-Of-Asphaltum-Road-And-I.p.s-Footpath-Including-Ancillary-Work-At-Suri-Lane,-Creek-Row-And-Different-Placess-In-Ward--50-Under-Borough-v.>2024-10-22
-Bracket,-For-Safety-Wire-Rope-For-Brake-Beam-Drawing-No.:--Cc-03220-,-Alt-(a)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Tot>India -Bracket,-For-Safety-Wire-Rope-For-Brake-Beam-Drawing-No.:--Cc-03220-,-Alt-(a)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Tot>Supply Of Bracket, For Safety Wire Rope For Brake
Bracket, For Safety Wire Rope For Brake Beam Drawing No.:- Cc-03220 , Alt (a) [ Warranty Period: 30 Months After The Date Of Delivery ][quantity Tolerance (+/-): 5 %age , Item Category : Normal , Tot
-Bracket,-For-Safety-Wire-Rope-For-Brake-Beam-Drawing-No.:--Cc-03220-,-Alt-(a)-[-Warranty-Period:-30-Months-After-The-Date-Of-Delivery-][quantity-Tolerance-(+/-):-5-%age-,-Item-Category-:-Normal-,-Tot>2024-10-22
Philippines Procurement Of Additional Rice Bags For Distribution To Families Affected By El Niño At Medellin, Cebu 2024-10-22
qty:579
>India
qty:579
>Supply Of Boot To Drg No: 765-17-29 As Per Qai/rubber/cqa(icv) /005 Dec 2003, Gasket 765-56-105 As Per Specn Extract Qai/rubber/cqa(icv) /005 Dec 2003
qty:579
qty:579
>2024-10-22
India Supply Of 1 Peptide Sequencing Using Lcms/ms Novelgene. 2024-10-22
-Construction-Of-Single-storied-Community-Toilet-(ladies-And-Gents)-At-Gadiyara-Tourist-Spot-Within-Shyampur-i-P.-Samity.>India -Construction-Of-Single-storied-Community-Toilet-(ladies-And-Gents)-At-Gadiyara-Tourist-Spot-Within-Shyampur-i-P.-Samity.>31 Of 2024-25(2nd Call) Sl. No.7 Dt- 01.10.24
Construction Of Single-storied Community Toilet (ladies And Gents) At Gadiyara Tourist Spot Within Shyampur-i P. Samity.
-Construction-Of-Single-storied-Community-Toilet-(ladies-And-Gents)-At-Gadiyara-Tourist-Spot-Within-Shyampur-i-P.-Samity.>2024-10-22
Whats app